Cédric Nguyen
Ingénieur - Doctorant, Limos / Renault Trucks
Engineer specializing in "Optimization of Industrial Systems and Logistics" I also supplemented my studies with a MSc at Ecole Centrale Paris and an year abroad in UK (Cambridge University) and China (Zhejiang Advanced Manufacturing Institute).
Since November 2009 I am doing a Ph.D. in industrial scheduling in collaboration with the factory Renault Trucks Bourg-en-Bresse.
The issue of this study is to design and implement new decision tools and methodology for robust planning and scheduling on an flexible assembly line in an uncertain environment.
My skills mainly concern :
- Supply chain operation,
- Material and information flows management,
- Industrial systems improvement,
- Lean Manufacturing.
In the longer term I would like to steer my career to positions in Asia particularly China, where I already had the opportunity to work.
Cedric Nguyen
nguyen.cedric@gmail.com
+33 (0) 6 31 97 10 28
Designed and implemented new decision tools and methodology for robust scheduling on assembly line with uncertain environment
2009 - 2009"Product Data Management optimization and process related."
• Mapping the data flows,
• Audited the softwares,
• Defined and implemented improvement solutions :
- Optimized data sharing,
- Evolved software to more suited tools,
- Defined training needs for ~ 25 employees,
- Redistributed PDM software licences: Decrease the cost of the fee.
Engineer Researcher, Cambridge University, Institute for Manufacturing, Distributed Information and Automation Laboratory
2008 - 2009"Used RFID technologies to improve the logistic process of CARREFOUR Group in the European project BRIDGE."
• Defined the improvement propositions:
- Stock management and inventory process (~8000 products),
• Implemented RFID solutions (reading arch),
• Collected and analysed results :
- Betterment of data accuracy (40%),
- Decreasing of check time for delivery (80 to 95%),
- Reducing by 30 for inventory time.
Project manager assistant, Zhejiang Advanced Manufacturing Institute of Hong Kong University of Science and Technology
2008 - 2008"Started of an IT project for the Chinese shipyard."
• Researched and benchmarked about shipbuilding :
- Competitive calibration,
- State of art and study of technologies,
• Formalization of the specifications of the project,
• Teaching for a 5 people team about the principles of Lean Manufacturing.
2007 - 2007"Chemicals Management and Related Risks"
• Evaluated quantities (several thousand tonnes per year) and product toxicity for REACH regulation,
• Audited for security standards,
• Modelled and optimized organisation of chemical products management,
• Implemented ATEX regulation.
2007 - 2007"Implemented planting plans (4000 ha, 70 kinds of corn, 400 farmers)."
• Formalized and modelled the issue by the mathematical way,
• Linearized the problem,
• Solved :
- 25% of improvements for planting plans,
- Decreasing by 100 of computing time for planting plans,
• Publication for the conference INCOM09 : “Using mathematical model for allocation of seedling in Seed Production : a case study”.