Céline Abdelhay
Ingénieur hydraulique, Groupe Ingenierie, Bordeaux
2009 - 20096 months - In charge of a class with 10 children between 3 and 4 years old.
2008 - 2009Morphodynamic study of alpine river Valloirette characterized by variation of sediment load.
- Diagnosis of functioning based on field observation, history, long profile & course of river.
- Estimation of sediment transport, discharge of river and volume of debris flow of affuents.
- Proposition of solution to regulate solid transport & protect human activities.
2008 - 2008April - July 2008: "National drainage project of Egypt", Ministry of Water Ressources and Irrigation, Cairo - Egypt.
Technical assistance to the Ministry for the program of rehabilitation of pumping stations: Site visit of 18 pumping stations in all Egypt and reporting of works to the financers, ministry and contractors.
August 2008: Training for GIS Department of High Aswan Dam Authority, Ministry of Water Ressources and Irrigation, Aswan - Egypt
Assess abilities, human & material needs and organise work of GIS department.
Teach the basics of GIS, ArcGIS and examples of use and practise with ArcGIS.
2007 - 2007Morphodynamic study of the river Galaure causing problems of erosion & flood
-Geomorphological assessment of the river, analysis of the stakes on catchment area
- Diagnosis of the river functioning and its solid transport based on granulometry campaign & aerial pictures analyse.
- Demarcation of a space of freedom and proposition of strategy of intervention or not.
2006 - 2006Quality of forecasts of Flood Early Warning System FEWS-Rhine on the period 2002/05
- Creation of a VBA-program to calculate the performance indicators of the forecasts.
- Report concluding on the choice of performance indicators to implement in FEW
2005 - 2005Installation and test of the device: Aquapod measuring water quality in drinking water plant.
- Data processing in Matlab and analyse of results of one-month test.