Erwan Rivoallan
QAQC Supervisor, Total E&P Angola
Over 15 years of experience in Oil, Gas, Nuclear and chemical industries.
I have been involved in various projects Offshore and Onshore, in West Africa and Northern Europe.
I fully consider each mission as a new challenge and aim to a constant increasing of my Skills and professional knowledges.
My Field of competences :
• QA/QC management, good practice of norms ASME V, IX, B31.3, B31.8, EN 287.1, EN 5817, EN 13480, AWS D1.1, ASTM, RCCM, iso 9001 & 14001.
• Welding and NDT Supervision of pipe prefabrication, erection, structural works, pressure vessels, valves, welder qualification tests on various types of metals & materials. Good practice of surface preparations, coating & painting
• Visual inspection of piping & structural works, valves & rotating equipments
• Expediting & check-lists
• Planning & POB management.
• Permit to Work Co-ordination
• Good practice of P&ID, isometrics & construction plans
• Planning assessment
• Reporting to top management (in English, Italian & German)
• NCR, CAR & FCR management
• Easy adaptation to complexes situations (local workforce recruitment, custom & logistic management in West Africa)
• Good organization, easy adaptation & communication skills
• International mobility
In charge of QAQC Supervision for Piping & Structural works on DB17/Angola for FPSO Dalia, Girassol & Pazflor.
2010 - 2012*Planning assessment & update on a daily basis.
* Task coordinator between onshore management and teams of NDT inspectors, HSE & PFP / Coating teams.
*POB management in accordance with Offshore HSE rules and regulation
2010 - 2010Responsible for piping inspection, testing and commissioning, punch listing and reinstatement. Compiling of QA/QC documentations & preparing QA/QC documentation prior to handover system to client. Ensure that piping is being installed as per approved P&ID’s and specifications. Independently generating various ITPs for equipment and structural works / Piping Hydro test Packs and getting it approved from Client. Field inspection of all structural and all equipments installation works. Keeping record of all quality documents relevant to mechanical and piping works like alignment record, piping test pack record.
2008 - 2009-Permit To Work Management on FPSO Girassol (Block 17 - Total E/P, Angola).
-QHSE Reviewing of PTW while preparation of a Coating / painting campaign
-QA/QC co-ordination of piping inspection between Girassol SIMOPS, Production Team, QA/QC Leaders Total and the various sub-contractors (Ponticelli, Prezioso, Friedlander).
2007 - 2008Acergy is a Oil & Gas engineering company specialised in seabed-to-surface.
I joined the ACERGY offshore team in september 2007 for a set of revampings and hook ups for MPN (Exxon Mobil Nigeria).
2006 - 2006In charge of the co-ordination of Work permits on Rosa Project (Girassol / TOTAL - Angola)
- SIMOPS
- I.P.A software
- ICAPS
2003 - 2007NDT Welding superintendant on Rosa Project (FPSO Girassol - Total Angola)
Welder Foreman, QC Inspector & QC Officer on different projects all over
western Europe (The Netherland, Danmark, Germany, Belgium, Luxemburg etc)
1999 - 2007I started with Ponticelli (D.T.I division) as a pipe welder and left the company as a QA/QC inspector. During this period I have been as well a Welder foreman and QC assistant...Anyway, I always wanted to see the QA/QC part of the job and managed it !
With Ponticelli, I travelled constantly all across Europe; mainly in the north (Germany, The Netherland, Belgium ...)
1994 - 1996I joined the Gendarmerie for my national service. after a training in Auxerre (C.I.G.A) I got an affectation in a Brigade Territoriale (BT), then in a P.S.I.G (48).
I have spent there some very exiting moments. To serve in the GN has been for me a great experience.
1991 - 1994Many ponctual missions as a security officer for events and political personalities.
I am currently integrated to the QC team of EPR / OL3 Project (Finland), as a QC Welding Inspector.
Our tasks:
-Follow the sub-contractors (warehouse and field) & be sure that they respect the Quality Plan, norms, National Regulation and Areva specifications.
-Check and record all piping & supports in prefabrication and site construction.
-Plan and organize the visual inspection with the client (TVO) and the Finnish Nuclear Safety Authorities (STUK).
-Reporting to OL3 and back offices management
-Planning management
-Expediting
-Hydro-tests, Leak Tests co-ordination
-Pre-commissionning and commissionning of various equipments (rotating or not).