Gildas Le Men
Project Manager, CUMMINS FILTRATION
After several years as a Technical Leader in Product Development for European truck manafacturers, DFSS and cost reduction Project leader, I'm currently 6 Sigma Black Belt DMAIC, leading continuous improvement projects and participating to the Lean Manufacturing transformation of Cummins Filtration France.
These experiences gave me a good knowledge of processes like plastic injection or aluminum cating, but also assembly lines or logistics flow.
I'm also a handball coach and a regular runner; I did 2 marathons in 2008 and I'm about to do Paris marathon in April 2009.
2007 - 2009For 2 years I have been leading Continuous Improvement Projects, using 6 Sigma DMAIC methods. Here are my main projects:
> Sub-assemblies supply lead time reduction in order to increase production line flexibility and improve our capacity to supply our customers. This project came to a process redesign of the flow and to the in sourcing of sub-assembly manufacturing.
- Annual savings: 500 000 $ -
> Leakage risk reduction on a new Fuel and Water Separator. This project proved that suppliers process were not under control. Action plan and control plans were set up in suppliers.
- Annual savings: 200 000 $ -
> Filtration media scrap reduction on an Air Filter line. This project put in evidence 2 main process of scrap, one which was optimized by parameters correction and the other which was solved by redesigning the process.
- Annual savings: 100 000 $ -
> Optimization of gloves usage in order to improve operator protection at the lowest cost.
- Annual savings: 50 000 $ -
I’m also deeply involved into the lean transformation of the plant by participating to Kaizen events, setting up the takt time, installing dashboard and reducing wastes.
> Cost reduction Project leader using Value Analysis tools
- Annual savings: 200 000 $ -
> Project leader for product ressourcing in India
- Annual savings: 100 000 $ -
> DFSS Project leader : Crankcase ventilation filter design optimization for a European truck manufacturer
> DFSS Project leader : Spin-on filter centre tube redesign, dimension optimization and design validation by using statistical tools
- Annual savings : 200 000 $ -
> DFSS Project leader : Air filter outer body redesign and validation by using statistical tools
- Annual savings: 500 000 $ -