Gildas Le Men

Project Manager, CUMMINS FILTRATION

29180Guengat (Quimper)Brittany - France

After several years as a Technical Leader in Product Development for European truck manafacturers, DFSS and cost reduction Project leader, I'm currently 6 Sigma Black Belt DMAIC, leading continuous improvement projects and participating to the Lean Manufacturing transformation of Cummins Filtration France.

These experiences gave me a good knowledge of processes like plastic injection or aluminum cating, but also assembly lines or logistics flow.

I'm also a handball coach and a regular runner; I did 2 marathons in 2008 and I'm about to do Paris marathon in April 2009.

Gildas Le Men
80 contacts
Since 2010

Product development for Scania

Automobile
Professional experience
2007 - 2009

For 2 years I have been leading Continuous Improvement Projects, using 6 Sigma DMAIC methods. Here are my main projects:

> Sub-assemblies supply lead time reduction in order to increase production line flexibility and improve our capacity to supply our customers. This project came to a process redesign of the flow and to the in sourcing of sub-assembly manufacturing.
- Annual savings: 500 000 $ -

> Leakage risk reduction on a new Fuel and Water Separator. This project proved that suppliers process were not under control. Action plan and control plans were set up in suppliers.
- Annual savings: 200 000 $ -

> Filtration media scrap reduction on an Air Filter line. This project put in evidence 2 main process of scrap, one which was optimized by parameters correction and the other which was solved by redesigning the process.
- Annual savings: 100 000 $ -

> Optimization of gloves usage in order to improve operator protection at the lowest cost.
- Annual savings: 50 000 $ -

I’m also deeply involved into the lean transformation of the plant by participating to Kaizen events, setting up the takt time, installing dashboard and reducing wastes.

Automobile

> Cost reduction Project leader using Value Analysis tools
- Annual savings: 200 000 $ -

> Project leader for product ressourcing in India
- Annual savings: 100 000 $ -

> DFSS Project leader : Crankcase ventilation filter design optimization for a European truck manufacturer

> DFSS Project leader : Spin-on filter centre tube redesign, dimension optimization and design validation by using statistical tools
- Annual savings : 200 000 $ -

> DFSS Project leader : Air filter outer body redesign and validation by using statistical tools
- Annual savings: 500 000 $ -

Metal
Education
Hobbies
Handball , Running

Visitors to this profile also viewed these profiles
Jack Loong
Sales Reps, Honyien Plastics Company, Inc.
Thierry Couvin
Projeteur, Segula Technologies
Shi Lily
Oversea marketing , shanghai yanpai filter cloth ltd.
Fabien CHENE
Production Unit Manager, ALFA LAVAL (38)
Matthieu ALLOT
Coordinateur Lean et Qualité
FRANCOIS BRUNS
ATR, MJ INFO
Cassandre Jean marie
Secrétaire, administratif
Samuel MONNIN
Responsable Support AEOLUS, LOG SYSTEM
Ruud Weyers
Business Development Director, TaskType Inc
SEBASTIEN LE POLLES
Flex Fuel Ethanol Développement
Viadeo for your career: Create a profile | Job ads | MBA/Masters