Maxime Labruyère
Ingénieur Système Trains d'atterrissage, Aeroconseil
2009 - 2009Creation of the mapping of the tools used in engineering processes concerning system installation:
- Design and programming of a mapping tool
- Inventory and analysis of the tools and the data used in the processes
- Analysis of the tools ongoing improvements
- Identification and study of new tools improvement opportunities
2008 - 2008- Management of a new metallic boxes project and design of the products
- Design of a connector for hazardous locations
- Study of patents and of competitors products for a new line of fittings
2007 - 2007Preparation of an ISO 9001 audit
- Coordination of the processes with the process leaders
- Creation of a documentation management tool
- Conduction of a satisfaction survey
2006 - 2006- Determination of technical specifications of a space platform
- Improvement of LabVIEW programs for vacuum thermal tests
- Studies and tests of screws mechanical behaviour
2005 - 2005- Reception, labeling and storing of parcels
- Preparation of compounds collections for assembly or expedition