Mickaël Lorant
Electrical Commissioning Supervisor, ALSTOM - On-site Expatriate
Education
======
Dual Degree in Electrical Engineering:
University Karlsruhe (TH) - Germany
Grenoble INP - ENSIEG - France
Professional Skills
==========
Design and Commissioning for HV Systems, Electrical distribution & Protections
HV switchgears, Thermal & Hydro power plants.
Management of multicultural teams.
French : mother tongue.
English : fluent, daily practice.
German: fluent, 1 year in German university, 6 months in Switzerland, DSH.
Spanish: basic knowledge, 3 months in South America.
Manage commissioning engineers & electricians, Tests Coordination, On-site commissioning, Technical support, Troubleshooting, Trainings for operators.
- BOP: Switchboard, DC/UPS, Batteries, DG-set, Transformer, P320 Control System.
- HV Substation: CT, VT, ES, DS, HVCB, LCP, Earthing Grid, Interlocks.
- Power Evacuation:GCB, Generator&Main transformer Protection, Tripping Matrix.
- Skids: Local Control Panels, HVAC, Lighting system.
• 5x50 MW Hydro Power Plant, Bujagali, Uganda – 1 year.
• 132 kV AIS HV Switchgear, Bujagali, Uganda – 4 months.
• 110 kV GIS HV Switchgear, Shoaiba 3, Saudi Arabia – 2 months.
2007 - 2010Design, Engineering studies, Technical tender analysis & Factory acceptance tests:
- Electrical BOP: MV&LV switchboards, Transformers, DC/UPS, Diesel.
- Power Evacuation: GCB, Metering, Synchronisation cubicle.
- HV Substation: HVCB, Current&Voltage Transformers, Earthing&Disc. Switch.
- Protections: Selectivity and Protections, I/O programming relay logics.
• 858 MW Lignite-fired Thermal Power plant, Belchatow, Poland.
• 110 kV GIS substation, Shoaiba 3, Saudi Arabia.
• 220 kV AIS substation unit bays, F´Kirina 2, Algeria.
2007 - 2007“Investigation of the stresses imposed on the generator circuit-breaker due to fault currents and transient recovery voltages caused by out-of-phase synchronisations”