2011 - 2011On-board electronics and software developer
2010 - 2010Internship (January 2010-August 2010).
Gaz pipeline automation project using LabVIEW. Development of a State Machine and several VIs (for the pipeline) in order to control the flow, temperature and humidity. Development of a VI for data acquisition from a HP/Agilent 4194a Analyzer (Gain/Phase and Impedance).
2009 - 2009Project manager assistant in charge of new projects’ organization and sales.
2008 - 2008Employee Purchase and Sale at an international level for a proposed co-generation power plant using turbofans. During these 3 months, purchasing and delivery of equipment in the factory was my responsibility within delays, the budget and the manufacturing time.
2007 - 200710 weeks training placement at the end of the University Diploma of Technology in Electrical Engineering, Electronics and Automation. The internship purpose was the design of low consumption lighting elements on multi layer flexible circuits.