Menu

Alexis GRILLOT

Paris

En résumé

Mes compétences :
industrial engineering
project management

Entreprises

  • Technip UK Ltd - Placement

    Paris maintenant Faisibilty study in order to modify the biggest vessel of the fleet. This study investigated:
    -economic viability
    -planning
    -technical faisibility
    -management of change
  • BP - Commissioning Engineer

    Cergy 2012 - maintenant
  • Technip USA -Houston - Placement for master degree

    2009 - 2009 Model and improve the installation engineering process.
    Create and implement a reporting/monitoring tool.
  • TechnipUSA - Installation Specialist

    2009 - 2012 Pre commissioning engineer for susbsea projects.

    THe pre commissioning consist of a wide spread of test and operations to check the integrity of the equipment after installation and condition the lines for commissioning.

    Scope of work:

    Part of a project team under the project manager supervision the Pre commissioning engineer should:

    Bid stage:
    - develop methodology
    - help setting the pre commissioning budget
    - finalize technical qualifications with the client
    - provide a planning of the activity

    During the engineering stage:
    - Send out sub contractor bid and perform technical review of the bidders
    - Follow specific equipment fabrication (pig receiver...) from engineering to delivery
    - Supervise subcontractor and reviewand approve procedures, interact with installation team

    During offshore operation:
    - Prepare mobilization, perform equipment test
    - Supervise subcontractors
    - Client point of contact
    - installation point of contact

    This position requires management skills, organization and autonomy.


    Projects:

    - 2009 Appaloosa (ENI Petroleum) Gulf of Mexico
    - 2010 Nansen (Anadarko) Gulf of Mexico
    - 2010 CDP (BP oil spill) Gulf of Mexico
    - 2010 Aseng (Noble energy) West Africa

    Tenders:

    - Coga (Total) West Africa

Formations

Réseau

Annuaire des membres :