2009 - 2010Piping Lead Engineer on the revamping project of the Terminal Méthanier de Montoir de Bretagne, ELENGY GDF-Suez
- Responsible of the piping studies for the 2010 revamping: cryogenic supports replacement, valves replacement, new units
- Piping and insulation project contracts: technical selection and follow up
- Field enginering: technical solutions to construction problems
- Preparing the PED (European Pressure Equipment Directive) files
2008 - 2009Piping Lead Engineer on the project INEOS S5-TGT, sulfur recovery unit
- Responsible of the piping studies: coordination of the design team (3Dmodel in PDMS), stress analysis and material management, preparation of the technical proposal , piping work description for the piping contractor
- Workshare with the Mumbay Jacobs office
2006 - 2008Piping Lead Engineer on the Air Liquide, Pergen Project, The Netherland – Cogeneration project inside the Pernis Shell Refinery near Rotterdam
Field Engineering (Pernis, the Netherlands) :
- Interface with the Piping Contractor
- Technical solutions to construction problems
- Pre-commissiniong phase: steam blowing and chemical cleaning preparation
- PED certification lead
Responsible for the end of the detailed engineering in the Paris office :
- Coordination of the design team, stress analysis and material management
2004 - 2006Offshore Gas Compression Complex – East Area Project, Nigeria,
Malaysia, England, South Korea, Nigeria
- Initiated the the job cards workflow: material identification and inventories, compilation of the hook-up and offshore installation drawings, manpower estimation.
- Issued the hook-up and commissioning planning
- Led the offshore planning team (2 people). Setup database for progress report: Daily reporting, recording and processing manhours
- Provided day-to-day support to the Hook-up Manager on various issues
2004 - 2004South Pars Phase One Project (SPP1), U.A.E
- Launched the procurement of two years spare parts after SPP1 start-up. Negotiated with vendors. Work included budget presentations to the client
- Assisted developing procurement software to issue purchase orders (from site request to delivery note) and weekly status report
2003 - 2004Offshore Gas Production Complex –South Pars Phase One (SPP1), Iran,
- Maintained and updated the IPCIS database (software to monitor pre-commissioning and commissioning activities).
- Coordinated the punch lists. Carried out weekly reporting: commissioning activities, punch lists, progress
- Final documentation
- Provided IT and technical engineering support. Trained the commissioning engineers to use the IPCIS software
2002 - 2002Onshore Oil Production Facilities – TOTAL, East Shabwa, Yemen
- Evaluated, designed and followed up the minor modifications on the plant. Performed a PID check. Organized the PIDs update
- Assisted supervision during commissioning and start-up of a remote Control Process Unit.