Christophe KUSIOLEK
Technical Manager & Preparation Manager, PONTICELLI
2009 - .... Piping Construction Engineering Manager & Preparation Manager
TOTAL E&P Nigeria Limited
OML 58 UPGRADE PHASE 1 PROJECT
2007 - 2009 Technical Manager, Engineering Manager & Preparation Manager
Sonangol, Total , Exxon & BP
Ponticelli Angoil - Portumo / Luanda Angola
2005 – 2007 Piping Construction Engineering Manager & Preparation Manager Fos sur Mer France / Ponticelli Angoil - Portumo Luanda Angola / Sonamet Lobito Angola
TOTAL E&P Angola
Rosa Development Project Girassol FPSO
2004 Preparation Manager
TOTAL Flandres / Dunkerque (France)
Participation in HP Loop Project
2003 - 2004 Preparation Manager
ELF PETROLEUM NIGERIA LTD / Nigeria
IBEWA-OBAGI End Facilities Revamping
2003 Preparation Manager
ELF PETROLEUM NIGERIA LTD / Nigeria
Participation in ODP1 Platform Hook-up
2002 Preparation Manager
STATOIL / Mongstad (Norway)
Participation in PQP Project
2001 - 2002 Preparation Manager
VEBA OEL / Sholven (Germany)
Participation in shutdown preparation for Hydrocracker Revamping Project
Feb. 2001 Preparation Manager
VEBA OEL / Gelsenkirchen (Germany)
Participation in the Auto Oil II Project - (Spoolgen / Spoolbridge)
Preparation Manager
BUTACHIMIE / Chalampé (France)
1st cutting for EDEN 1 Project (France)- SYTEX (Spoolgen)
Preparation Manager
PETROZUATA / Jose (Venezuela)
Participation in VEHOP Project in France – Test pack
ATIM (Ponticelli's subsidiary)
Estimating for Yemen + material estimating
1998 / 2000 Preparation Manager
ELF NIGERIA / OBITE GAS Project (Nigeria)
EPCc Contract - Construction of a gas extraction unit
1998 Preparation Officer
SHELL - MONTELL / Berre l'Etang (France)
Construction of a polypropylene unit
1998 Preparation Officer
FINA / Antwerp (Belgium)
NC3 Unit shutdown
1997 Preparation Officer
EXXON / Rotterdam (Holland)
Revamping and construction of a paraxylene unit
1997 Preparation Officer
EXXON / Gonfreville (France)
Carrying out of the OMEGA Project
1996 Preparation Officer
ELF ATOCHEM C. T. A. / Pierre Bénite (France)
Preparation of the shut-down "Reconversion BALAN 3"
Piping works (high & medium pressure)
1996 Preparation Officer
AMOCO / Geel (Belgium)
Construction of a polypropylene unit
1995 / 1996 Preparation Officer
ELF CONGO - N'KOSSA Project / Port St Louis
Inter-connecting modules
1995 Preparation Officer
ELF CONGO - N'KOSSA Project / Bassens (France)
Construction of modules M2 (treatment & sea-water injection)
1994 Preparation Officer
BP / Dunkerque (France)
Piping checking during the shut-down