David BRETON

SUPERVISEUR TRAVAUX

75ParisIle-de-France - France

Travaillant sur un FPSO je suis responsable d'une équipe de construction comptant une dizaine de personnes locaux et expatriés pour la partie élec et instrum. Préparations des activités, ROC, RLO, préparations des permis,pré-com.

David BRETON
Le Boissard
73520 Saint Béron, France
Tel. +33 (0)6.19.86.11.30
DOB: 25/06/1974, married, 2 Children
N°S.S: 1 74 06 73 068 172
d.breton@hotmail.fr
Passport n° 1 : 09 PD 25100 - Expire in: 01/ 2012
Passport n° 2 : 08 CE 36014 - Expire in: 06/ 2018


Electrical / Instrumentation
Supervisor & Coordinator
Offshore E/I manager


PROFESSIONAL EXPERIENCE


Year 2011 E/I Construction supervisor on FPSO KIZUMBA B, EXXON MOBIL ANGOLA
SPIE ANGOLA
Revamping, hook-up & Integration SATELITE project (phase 1
Supervision, preparation and organization of work)


Year 2010 E/I Construction Rep.
SPIE ANGOLA
Unit chloration revamping
Precommissioning and commissioning assistance

New Davitt life boat installation.
Precommissioning and commissioning assistance

Since August 2009 E/I Construction Rep. on BLOC 3, ANGOLA SONANGOL PP
SPIE ANGOLA
E/I Construction Rep.
Task performed:
RLO/ROC (Réunion Lancement d’Opération) Preparation and coordination E/I work.
Risk assessment, Task plan and execution.
-Cubicles Marshaling installation and connection
-Connection and shunt-Down for transformer
-Reporting and weekly follow-up
-Precom follow-up and task sheet dossier (documentation,
-Start-up phase
Logistical responsible of Team composed by 15 pax ( Local & Expat). Workpermit preparation, follow-up and coordination.

Since May 2008 E/I Construction Rep. on DALIA FPSO TOTAL E&P ANGOLA
SPIE ANGOLA
E/I Construction Rep. on VISCO Project.
Task performed:
RLO/ROC (Réunion Lancement d’Opération) Preparation and coordination E/I work.
Risk assessment, Task plan and execution.
-Cubicles Marshaling installation and connection
-Connection and Shut-Down preparation for BUS bar connection
-Reporting and weekly follow-up
-Laboratory installation
-Precom follow-up and task sheet dossier (documentation,
-Start-up phase
Logistical responsible of Team composed by 15 pax ( Local & Expat). Workpermit preparation, follow-up and coordination.

Jan 2008 to May E/I Service line assistant manager
SPIE NIGERIA LIMITED
Respond to tenders, place orders, purchases
Management the E/I team.
Client visit on site to coordinate & plan activities.


Dec 2005 to 2007 E/I Construction Rep. on ROSA FPSO Girassol TOTAL E&P ANGOLA
SPIE ANGOLA
Revamping, hook-up & Integration ROSA project
Supervision, preparation and organization of work
Logistical responsible of Team composed by 15 pax ( Local & Expat). Workpermit preparation, follow-up and coordination.

May 2000 to 2005 Industrial electrician
SYLENE Company in Chambéry (Savoie)
Cabinets connection, installation, commissioning & start-up.
Maintenance on site

- July 2003: SPIE CAPAG facilities in Algeria:
Pump Commissioning and maintenance, subcontracted by FLOWSERVE

- March to July 2002: Supervision, assembly, installation and commissioning of E/I equipment on drinking water pumping stations, subcontracted by TEC INTERNATIONAL company, in Eritrea.
- Sept to Nov 2001: PETROGAL RAFINERIE DE SINES: Integration of a cabinet subcontracted by the company DRESSER RAND, on site in Portugal.
Supervision of different projects for EDF power plants, TOTALFINA, SULZER, GUINARD TEXTRON, GDF, ETREZ: Installation and electrical connections for a gas compressor sub-contracted by the company DRESSER RAND.

Aug 1999 to 2000 Maintenance manager assist.
SICAMEN BOURGOGNE, Beaudrières
Automate, hydraulic, electrical maintenance in charge
-Incubator, hatcher, vaccination

Diploma - Education


Feb to July 1999 Professional employment contract
MIFE COUVOIR DE SAVOIE, Sonnaz (Savoie)

1995/1996 Industrial Technologies DEUG degree program, first year, University of Savoie, Le Bourget du Lac (Savoie)

1994 A level F3 (electrical engineering), Lycée Monge, Chambéry (Savoie)


Medical
Yellow Fever in 200

134 contacts
Expérience professionnelle
2008 - 2009

Responsable de la partie travaux pour le secteur élec et instrum sur un FPSO DALIA en ANGOLA pour TOTAL E&P . A la tête d'une équipe d'une dizaine de personnes, locaux et expatriés. Préparations des permis, organisation des équipes, RLO,ROC, préparation des permis de travail (TRACKS), pré-com, survey.
Projet VISCO,Projet WASH WATER BOOSTER PUMP.

Pétrole (production - distribution)
2005 - 2007

Responsable d'une d'équipe électricité d'une douzaine de personnes, locaux et expatriés sur le FPSO GIRRASOL en Angola pour TOTAL E&P.Organisation des équipes et du travail.Lecture des plans.

Pétrole (production - distribution)
Ancien élève de
Hobbies
PLONGEE , ECHEQUES , VTT

Les visiteurs de ce profil ont aussi consulté
Claude Charpentier
Conducteur de Travaux (élec./instrum.), Eurotech Export
Sem Ricardo Siregar
Senior HR Business Partner - PT. VALE Indonesia, Tbk
Guy Buisson
Ingénieur Superviseur Electrique, RIO TINTO
Denny Araujo
Estudante, Ailton Pinto de Andrade
Sébastien Dufour
Responsable commercial, CMI Services
Michel Duruflé
Consultant elect. /Instrum., Addax Petroleum
FOUSSENI COULIBALY
Ingénieur d'étude énergie nucléaire
Louise Dru
Etudiant, rouen
Julien Feder
Intervenant prévention de la violence scolaire, Rectorat de l'Académie de Strasbourg
Christian Père
Enseignant-chercheur, ENSAM
Suggestions : SUPERVISEUR | SPIE
Viadeo pour votre carrière : Créez votre profil