David Lévy

Président, jade-i

75116ParisIle-de-France - France

David Lévy
25 contacts
Actuellement

High Tech
Expérience professionnelle
2004 - 2008

Arithmetic Components had developed very new technology for hardware arithmetic operators design
Set up, first round of financing, and preparation of the second round with a VC. Due to a technical uncertainty, we did not close the round.

Acco is a semiconductor design house in RF and analog designs
Acco was facing bankruptcy when I joined. My mission was to restructure, raise funds and develop the company
When I left, Acco had one year of cash in reserve, was fully booked with orders for the next six months, and Acco was valued 7 M€ in the last round of financing.

Électronique et microélectronique
2002 - 2003

Peaktime was dedicated to services and software in ratings optimization for radio, broadcasters and their sales houses, with 200 people and 4 locations.

Peaktime was restructured, and was sold when Vivendi faced major problems, in a very short time frame

Produits et services télécom - Internet
1998 - 2001

When I joined, my mission was to develop Bull-CP8. Due to Bull Group’s financial situation, I had in fact both to develop the entity and to sell one part of it every year.

Revenue for Bull-CP8 was 250 M€ in 1998. It was sold ultimately for 650 M€.

In 2000, Bull-CP8 entered GSM smart card market, and grew from 0 to 8% market share within one year, with no funding from the shareholder.

Électronique et microélectronique
1995 - 1996

during my tenure, my main concerns were: the restructuring of the defense industry, the effects of moving from a conscription army to a professional armed force, the review of procurement and program management policy.

EADS has been initiated during this period, and on top of these missions, we made a full cleanup of Giat’s accounts (Giat is the French land forces arms supplier)

Aéronautique - Marine - Espace - Armement
1993 - 1995

I was in charge of French and African mines (3500 people), commercial contracts with EDF (1.3 B€ revenue), and R&D (100 M$ annual budget)
Achievements: When I joined, uranium production cost was 25 $/Lb, much higher than the spot price (7$/Lb). I put in place a system to finance and buy an ore stock, with which we became profitable.
I also shut down one plant and one mining location.

Extraction - Mines
1990 - 1992

In addition to working on Cogema’s overall strategy, I worked on the French recycling policy for nuclear fuel, the elaboration of French law on nuclear waste, and the merger of Thomson, STMicroelectronics and Cogema.

Energie Nucléaire
Ancien élève de
Hobbies
Sailing , Piano , Rugby

Les visiteurs de ce profil ont aussi consulté
Thierry Weil
Directeur de recherche, ecole des mines
Marc SANSON
En recherche d'emploi
Laurent Chazareix
Directeur, Epicea Conseil
Alexandre Moatti
Directeur de la publication de www.science.gouv.fr, Ministère de la recherche
Frederic FANTOU
Country manager pour le Tadjikistan, SOFEMA
Brigitte Estèbe
Manager Transition. Performance Industrielle. Supply Chain. Lean manufacturing.
ARGENSON Daniel
Sous-directeur "Asie-Pacifique, Ministère de la défense / direction générale de l'armement
Nonette Cutrona
Secrétaire, Centre Hospitalier de Beziers
Sango Tabar
Agent technique, veolia
Joëlle Duffaut
Assistante, Prima Vista
Suggestions : Président | Jade-i
Viadeo pour votre carrière : Créez votre profil