Menu

Driss ALAMI MARROUNI

Courbevoie

En résumé

Mes compétences :
VHDL
SQL
Microsoft Windows
Microsoft Office
Linux
Java
C++
C Programming Language
Adobe Photoshop
Adobe Indesign
Etap
Caneco

Entreprises

  • Assystem - Consultant

    Courbevoie 2017 - maintenant
  • Edf - Contract Project Engineer

    Paris 2017 - maintenant Engineering Lead for different contracts (worth of circa £20m) for Hinkley Point C Project :

    - Coordination of the bidding process for the procurement of the electromechanical equipment (BNI contracts),
    - Piloting, monitoring and contribution to the preparation of the technical and commercial packages,
    - Management of the interfaces (technical, commercial, bidders and NNB British customer),
    - Analysis of offers, choice of the preferred bidder, follow-up of contracts, management of schedules, animation of the progress and clarification meetings, identification and mitigation of risks, management of the open points and reporting.
  • ALSTOM Transport - Innovation Project Engineer

    2016 - 2016 Innovation project management - Agile Methodology (Scrum Framework)

    - Concretization of ideas into innovative solutions (brainstorming, Studies "Strategy, Business Case, Feasibility")
    - Modelling of innovative solutions in terms of architecture and operating algorithm
    - Realization/ Test the mock-up of the technical solutions adopted by negotiating with suppliers and partners
    - Development of functional specifications and presentation of successful subjects to the innovation board of Alstom
  • L2EP - R&D Engineer

    2015 - 2015 Attached to the responsible of Power Electronics Team:

    Three phase inverter connected to the grid and improvement of its electrical and energetic performances: Hysteresis architectures control using state memory

    • Modeling and Simulation of the three-phase inverter connected to the grid using the Direct Power Control.
    • Developing a new architecture using the state of memory based on the following criteria:
    - Minimizing the number of switching,
    - Minimizing the total harmonic distortion.
    • Comparison with the Classical PWM.
    • Amelioration of the Electrical and Energetic performances of the three-phase inverter connected to the grid.
  • Jacobs engineering SA - Graduate Project

    2014 - 2014 Electrical department:

    • Study the possibilities to connect a new electrical substation of energy evacuation of the new plant (3x60 MW) taking into account the new restructuring of the grid 60 KV at Jorf Lasfar.

    • Basic design of the realization of the new sulfuric acid plant.

    • Dimensioning of the whole electrical installation MV / LV of the new electrical substation SAP (from the high current to low current).
  • OCP - Trainee

    Casablanca 2013 - 2013 Maintenance department: Analysis of the main failure modes for the electrical motors classified AA
  • RADEEF - Trainee

    Fès 2012 - 2012 Electrical grid department: Different equipment of electrical substation: HV / MV / LV and connection with public grid

Formations

Réseau

Annuaire des membres :