Franck CHABE

Franck CHABE

Project Manager, Freyssinet International
 

En poste chez Freyssinet International

Précédents : AREVA NP, SAIPEM SA

 

Précédents : ENSTA BRETAGNE (Ex ENSIETA)

 

    En résumé

    10 year experience in construction of major gas projects Now deeply involved in the construction of the latest French nuclear power plant

Parcours

 

Project Manager

Chez Freyssinet International

De janvier 2016 à aujourd'hui
 

Construction Manager

Chez AREVA NP

De janvier 2012 à mai 2016
 

Lead construction - constructability engineer

Chez SAIPEM SA

De 2010 à 2011
 

Area Manager

Chez SAIPEM SA

De 2006 à 2009
Leading the Engineering, Procurement and Construction activities related to building 3 x 160,000 m3 LNG storage tanks Based in Saint John, New Brunswick, CANADA
 

Method engineer

Chez SAIPEM SA

De 2004 à 2006
In charge of all the methods input for building the LNG storage tanks (piling works, jump form, welding of alloy steel) and the regaseification facilities (heavy lift studies, management of interfaces, plant construction philosophy, underground networks) Based in Guangdong province, People Republic ...
Lire la suite
 

Onshore construction - methods engineer

Chez SAIPEM SA

De 2002 à 2004
Technical input for bids for construction of LNG plants Studies for loadout of offshore structures (execution phase of project)
 

ENSTA BRETAGNE (Ex ENSIETA), Brest

Naval architecture - Offshore engineering, ENSTA BRETAGNE (Ex ENSIETA)

De janvier 1998 à décembre 2001

Compétences

 
  • Nucléaire

Langues parlées

 

Centres d'intérêt

 
  • Running (trail
  • half marathon
  • marathon) - Soccer