Guillaume HÉNIN

Subsea Installation Engineer, Technip France

75ParisIle-de-France - France

I am currently Subsea Installation Engineer at Technip France (La Défense - 92).

Guillaume HÉNIN
120 contacts
Depuis 2011

Since Oct-2011:
Technip France
Subsea Installation Engineer - Rigid Flowlines

Various tender projects (ref to previous experience at Technip as contractor).



Pazflor SURF project - Total Exploration & Production Angola

Oct-2011:
* 1-off rotation onboard Deep Pioneer offshore Angola for Pazflor project (Block 17 - Pazflor field) - installation of 4-off monophase subsea pumps, FL connection, testing and survey, recovery of various temporary structures used during installation phase and left on seabed ever since.

Pétrole - Exploration - Production - Raffinage
Expérience professionnelle
2009 - 2011

Oct-2009 to Sep-2011:
Mission for Technip France - La Défense (92)
Subsea Installation Engineer - Rigid Flowlines


Pazflor SURF Project - Total Exploration & Production Angola

Oct-2009 to Oct-2010:
* Installation engineering for rigid flowlines. Installation performed with Technip's construction vessel Deep Blue
* Issue Installation Procedures, Task Plans and Lift Plans
* Follow-up of required Installation Aids design
* Follow-up of Site Integration Tests of subsea structures

Nov-2010 to Mar-2011:
* Participation to HLV mobilization
* 2-off rotations onboard Deep Blue for installation operations offshore Angola (Block 17 - Pazflor field)
* On-site update of installation procedures when required
* Application of Technip's safety rules onboard during application of installation procedures
* Communication with client and vessel crew to deliver good-functionning products and match installation targets



Dalia UTH repair project - Total Exploration & Production Angola

Apr-2011:
* 1-off rotation onboard Deep Pioneer offshore Angola for Dalia UTH repair (Block 17 - Dalia field) - recovery, repair and reinstallation of 4-off leaking UTHs



Various tender projects

May-2011 to Sep-2011:
* Installation Engineering of rigid, flexible and HDPE lines for various tender projects (water depths from 0 to 1700m)
* Ensure feasibility of installation methods defined for technical bid
* Assess various Installation Aids required for operations
* Enable planning of operations for commercial bid

Pétrole - Exploration - Production - Raffinage
2009 - 2009

Apr-2009 to Sept-2009:
Internship in Subsea Installation service

Main Assignments:
* Consolidation works for the service: developing process and associated guidelines for Installation Aids design and follow-up through subsea projects engineering phase.
* Follow-up of Installation Aids design on Pazflor project (design specifications, design reviews and planning)
* Issue Rigging design reports for various riggings to be used on project

Industries - Energies
Ancien élève de
Hobbies
Sports:rugby , Judo Music:guitar , Piano

Les visiteurs de ce profil ont aussi consulté
Amélie Reygrobellet
Chargé de projet Radiorelevé, Veolia Eau
Jonathan Parra
Subsea Installation Engineer, Anotech
Pierre-Philippe Simonet
Ingénieur Travaux, Léon Grosse
Julien Jakoby
DA web Junior, Fromkayz
Benjamin Pfister
Ingénieur Validation, Akka Technologies
École Centrale Marseille
École Centrale Marseille
Elodie Riou
En recherche d'un emploi au sein de la supply chain
Sabri Descours
Etudiant, Edouard Manet
Aurélie Delalande
Chargée de clientèle, BNP
Max Saad
Etudiant, lycée jean mermoz
Viadeo pour votre carrière : Créez votre profil