Menu

Mohammadreza YOUSEFI MOBARHAN

Courbevoie

En résumé

Mes compétences :
Siemens Hardware
Programmable Logic Controller
Microsoft Office
Assembly Plants
PC Hardware
cost estimation
Zilog Z80 Assembly Language
Wiring Diagrams
SCADA
QBASIC
Oil Refineries
Natural Programming Language
Microsoft Windows XP
Microsoft Windows 9x
Microsoft Windows
Microsoft Project
Microsoft Office XP
Intel Assembler
IBM Hardware
HMI design
FORTRAN
Ethernet
DSP
Control and Instrumentation
C Programming Language
Bill of Materials

Entreprises

  • Saint-gobain - Ingénieure Automatisme

    Courbevoie 2017 - maintenant
  • AD-Hydromet - Ingénieur Automatisme

    2015 - maintenant Ingénieur automaticien/électrique dans la conception et fabrication des machines spéciales pour des raffineries de zinc (Anode Condition Machine) et de cuivre (Cathode Stripping Machine)
    Responsable de la conception de la partie électrification et automatisation ;
    • Définir le principe technique de l'automatisme et électrique de la machine.
    • Rédaction des analyses fonctionnelles en fonction du cahier des charges.
    • Définir l'architecture du système.
    • Choisir les composants d'automatismes et électriques optimum en termes de coût, qualité.
    • Participer à la réalisation du schéma électrique sous logiciel Eplan P8.
  • Brochot Group - Automation Engineer

    WINGLES 2013 - 2015 Position: Automation engineer for copper refinery EPC project 200,000 tons

    * Preparing basic engineering documents such as DCS technical specification, control system
    architecture, automation design criteria, control philosophy, datasheets for automation and instrument
    devices
    * Preparing detail engineering documents such as bill of material, logic diagrams, I/O list, instrument
    index, wiring diagram, cable schedule, etc.
    * Evaluating proposals and ordering the required instrument and control equipments ;
    * Supervising the contractors job quality and integrity ;
    * Preparing cost estimation for construction of a copper refinery (Electrical, Instrument and control
    system)
  • NEDA Industrial Group - Project manager

    2010 - 2013 Position: project manager & supervisor in DCS, ESD and PMS in the following projects:

    * Control system of Pataveh Gas Station (National Iranian Gas Co., Pataveh -Iran) (SIEMENS® S7
    PLC-400H full Redundancy/WinCC HMI®) (www.nigc.com)

    * Control system of four oil pipe line stations (National Iranian north oil pipeline Co., Iran) (SIEMENS®
    S7 PLC-400H full Redundancy/WinCC HMI®) (www.niopc.com)
    * Control system of Dehagh Gas Station (National Iranian Gas Co., Dehagh -Iran) (SIEMENS® S7
    PLC-400H full Redundancy/WinCC HMI®) (www.nigc.com)
    * Control system of setareh khalij oil refinery (Setiran Co., Bandar Abbas -Iran) ( SIEMENS® S7 PLC-
    400H full Redundancy/WinCC HMI®) (www.nigc.com)
  • Zargan Power Plant - Commissioning Engineer

    2009 - 2009 Position: commissioning Engineer for renovation of DCS old mimic panel to PCS7, (SIEMENS® S7-400
    H-System, WinCC with distributed I/O, Modbus communication, Isolators and instruments.
  • Femont N.V. - Supervisor

    2007 - 2009 Position: PLC logic design/programming, HMI design, and commissioning/start-up of Anode Scrap
    Washing Machine (ASWM) and Anode Preparation Machine (APM) used at Sarcheshmeh Copper Refinery
    located in Rafsanjan (www.nicico.com) [SIEMENS® S7 PLC 300 /ProTool HMI®, Micromaster drives,
    Rotary Encoder, Linear Encoder, Weighing System ,SIRIUS softstarters over Profibus & fiber optic
    networks] (www.nicico.com)
  • Firuzkuh Cement Plant - Commissioning Engineer

    2006 - 2007 Firuzkuh Cement Plant., Firuzkuh - Iran
    Position: Automation Commissioning & maintenance engineer [SIEMENS® S7 PLC 400H with
    distributed I/O , ECS FLSmidth HMI®, Instruments,Schenck and Pfister weighting system ,ABB Analyzer]
    (www.fizkcc.com)
  • Farineh San-at Electrical & Electronic Engineering Co. - Project Manager

    2004 - 2006 Position: project coordinator, programmer and monitoring expert in the following projects:

    * Control system of Kangan-Bandar Taheri Gas Pump Station (National Iranian Gas Co., kangan -Iran)
    (SIEMENS® S7 PLC-400H full Redundancy/WinCC HMI®) (www.nigc.com)
    * Control system of Crushers and Blending Sarcheshmeh Copper Industries (National Iranian Copper
    Industrial Co., Rafsanjan - Iran)(SIEMENS® S7 PLC-300/CitectSCADA HMI® ) (www.nicico.com)
  • Hes Farayand Gostar Co. - Project manager & programmer

    1998 - 2003 Iran(www.hesco.com)
    programmer and monitoring expert in the following projects:
    * Control & monitoring system of Ethoxilation plant (ARPC, Arak - Iran) (SIEMENS® S7 PLC-400 full
    Redundant/WinCC HMI®) (www.arpc-ir.net)

    * Control & monitoring system of the Noxol refluxor of the PVC reactors (BIPC, Bandar Imam - Iran)
    (SIEMENS® S7 PLC-300 Redundant/WinCC HMI®)(www.bipc.org)
    * Control & monitoring system of water treatment plant (SABA Tire Cord Mfg. Complex, Zanjan - Iran)
    (SIEMENS® S7 PLC-300/Citect HMI®) (www.sabatirecord.com)
    * Control & monitoring system of Amirkabir sugar factory water treatment plant (Ahvaz - Iran)

Formations

  • Lahijan University Of Technology (Lahijan)

    Lahijan 1992 - 1996 Bachelor of Science

    B.Sc. in Electrical Engineering, Electronic

Réseau

Annuaire des membres :