VESSEL: Saipem FDS (rotation 8 weeks on / 4 weeks off)
PROJECTS:
- KIZOMBA Satellites (Exxon Mobil), Angola
10'' x 16'' Sliding Pipe in Pipe installation (J-Lay)
12” Water Injection pipeline installation (J-Lay)
Suction piles installation
Production and water injection manifolds installation
Jumpers installation / recovery
SHR deployment (rigid pipe-in-pipe and flexible jumper)
- USAN (Total), Nigeria: Single Hybrid Riser (SHR) campaign
Riser fabrication (Injections & Productions Pipe in Pipe)
Flexible jumper deployment
Buoyancy tank connection
SHR overboarding, dewatering and docking
VESSEL: CPLB Crawler (rotation 8 weeks on / 4 weeks off)
PROJECTS:
- Critical Crude (Exxon Mobil), Nigeria:
24''/20''/16'' pipeline installation (S-Lay)
Bridges installation (associated piles hammering & grouting)
Spools fabrication / installation
- USARI-IDOHO (Exxon Mobil), Nigeria:
24'' pipeline installation (S-Lay)
- SCP (Total), Angola:
Gas injection platform hook-up activities
- Vessel maintenance/upgrade
2009 - 2010USAN project (Saipem FDS scope of work):
Flowlines and Risers installation preparation
Material follow-up
Installation aids fabrication follow-up
2008 - 2009PLCV 4000 project:
Dynamic positioning performances analysis