En résumé

Mes compétences :
Contrôle commande
Automatisme
Instrumentation

Entreprises

  • Yokogawa France - Chef de Projets / Project Manager

    2007 - maintenant 2013-2014 GIRRI Project for Girassol FPSO in Angola (TOTAL E&P Angola)
    Distributed Control System extensions for MPP (17 Stations + 48 Controllers)

    2012-2013 BIR SEBA Field production plant in Algeria (JGC JAPAN / SONATRACH)
    Integrated Control and Safety System (Centum VP + Prosafe RS + Stardom / 35 controllers)

    2012-2013 MOHO NORTH PRE-ENG. Offshore field in Congo (TOTAL E&P)
    Integrated Control and Safety System (Centum VP + Himax)

    2011-2012 GABES Gas storage in Tunisia (ENTREPOSE CONTRACTING / SNDP)
    Integrated Control and Safety System (Centum VP + Prosafe RS)

    2010-2012 GIRRI Project for Girassol FPSO in Angola (TOTAL E&P Angola)
    Distributed Control System upgrade and wells extensions (17 Stations + 48 Controllers)

    2007-2010 SERVICE PROJECT MANAGER : SEVERAL PROJECTS AMONG WHICH
    Integrated Control and Safety System upgrade (BP ISG in Algeria / SONATRAC)
    Centum CS Distributed Control System upgrade (OTV, CEO, AIR LIQUIDE France, OCP Morocco)
    Low Sulphur Diesel Oil of 16 Liquefied Natural Gas carriers (SHELL)
    Several LNG’s refits (SHELL, ANGLO EASTERN, GOLAR)
    Extensions, application modifications and site assistance in France (ARKEMA, AXENS, CPCU, GEOGAZ, GDF, RHODIA, SNF, TIRU, TOTAL, YARA France)
  • Yokogawa France - Adjoint Chef de Projets / Deputy Project Manager

    2002 - 2007 2005-2007 MOHO BILONDO floating production unit in Congo (TOTAL E&P Congo)
    Integrated Control and Safety System (Centum CS3K + Prosafe-RS)

    2002-2004 SOROOSH / NOWROOZ Offshore oil production plant in Iran (TECHNIP / SHELL)
    Integrated Control and Safety System (Centum CS3K + Prosafe PLC)
  • Yokogawa France - Ingénieur Principal / Overall Engineer

    1999 - 2002 2001-2002 OURHOUD Oil Production Plant in Algeria (JGC Japan / SONATRACH)
    Integrated Control and Safety System (Centum CS3K + Prosafe PLC)

    1999-2000 SOUTH PARS Gas Production Plant in Iran (HHI / TOTAL)
    Integrated Control and Safety System (Centum CS3K + Prosafe PLC)
  • Yokogawa France - Ingénieur / Lead Engineer

    1989 - 1999 1998 FINIMA Liquefied Natural Gas Carrier in Singapore (SHELL)
    Start-up and commissioning of the Centum CS Distributed Control System of the boilers (2 month)

    1997-1998 TORAY Film Production in France (TORAY France)
    Implementation with start-up and commissioning of a Centum CS Distributed Control System

    1996-1997 DEPA Gas Terminal in Greece (TECHNIGAZ Greece)
    Implementation with start-up and commissioning of a Centum CS Distributed Control System

    1995-1996 CEBRACE 3 Float Glass in Brazil (ST GOBAIN)
    Implementation with start-up and commissioning of a Centum CS Distributed Control System

    1993-1994 Five Liquefied Natural Gas Carrier (CHANTIERS ATLANTIQUE / PETRONAS Malaysia)
    Implementation of the Alspa ZS Distributed Control System for the machinery (fuel/gas boilers) and Cargo

    1991-1992 Several boilers in France (Fuel Oil And Coal)
    Implementation of the Alspa ZS Distributed Control System

    1989-1990 ARBOC Float Glass in Spain (ST GOBAIN)
    Implementation with start-up of the Alspa ZS Distributed Control System