Graziano Spano

Graziano Spano

Subsea Installation Engineer, Subsea 7
 

Précédents : Subsea 7, SUBSEA 7, DORIS ENGINEERING, BPP, BPP-TECH, Mariotti Shipyard, Floating Wind Atlantic Forum, BUREAU VERITAS

 

Précédents : Cranfield University, Dipartimento Di Ingegneria Navale (DINAV), University Of Genoa, Italy, Dipartimento Di Ingegneria Navale

 

    En résumé

    Vaste formation de base en ingnierie mechanique t architecture navale Au sein des theses de fin d'etudes, application de connaissances dans les domaines de structures marines offshore innovantes Experience en: - etudes de integrite sur flexibles, ombilicaux et cables electriques - role Ingenieur Project - taches: rediger cahier d'analyses , execution, presentation - analyses d'installation de structure marines offshore et subsea, flexibles, ombilicaux et cables - taches: rediger cahier d'analyses , execution, presentation electriques role Ingenieur Project - conception, suivi technique et execution de methodes pour pose de cables et ombilicaux sur le fonds de la mer et sur risers - role Ingenieur Lead d'installations - analyses structuraux liee au levages et transport maritime de structures offshore - role Ingenieur Project - taches: rediger cahier d'analyses , execution, presentation

Parcours

 

Lead Subsea Installation Engineer (Method)

Chez Subsea 7

De décembre 2014 à mars 2016
Project: CLOV Method Engineer for Replacement of Riser Monitoring System (RMS) Umbilical Cable and equipment (removal and installation of new), Method Development and analysis for cable removal and piggy backed cable installation along Hybrid Riser Tower, Reel Laying without tensioner and Subsea ...
Lire la suite
 

PROJECT METHOD ENGINEER

Chez SUBSEA 7

De janvier 2014 à décembre 2014
SUBSEA 7 (Acergy France) - contracted by SISAS FLYING LEADS INSTALLATION - PROJECT: EHRA NORTH PHASE 2 LOCATION: OFFSHORE NIGERIA, WATER DEPTH: 800 m - CLIENT: EXXON-MOBIL (1.5 billion US$) * Method Development for Flying Leads installation - Brownfield and Greenfield * Development of a ...
Lire la suite
 

Subsea Installation Engineer (Method)

Chez Subsea 7

De janvier 2014 à décembre 2014
Project: EHRA NORTH PHASE 2 Method Engineer for Flying Leads installation, Brownfield FL removal and shifting operations and Greenfield FL installation. Innovative Method Development for Subsea operations according to ALARP risk management principle, Method Analysis, Risk assessments, conventional ...
Lire la suite
 

Technical lead

Chez SUBSEA 7

De avril 2013 à décembre 2013
SUBSEA 7 (Acergy France - Paris) - contracted by SISAS PROJECT INSTALLATION ANALYSIS LEAD JACKET INSTALLATION - PROJECT: OFON2 LOCATION: OFFSHORE NIGERIA, WATER DEPTH: 100 m - CLIENT: TOTAL (1 billion US$) * Technical lead for installation analysis of OFD3 and OFD5 jackets & subsea ...
Lire la suite
 

Installation analysis engineer

Chez Subsea 7

De novembre 2012 à décembre 2013
Project: OFON2 Analysis of structure heavy lift operations, jacket lift-off and set-down, crane assisted upending operation, critical phases identification, modeling of vessel-structure system in FEM time-domain software, statistical analysis of response data, swell, calculation of DAF for ...
Lire la suite
 

SISAS PROJECT DESIGN ENGINEER

Chez DORIS ENGINEERING

De novembre 2012 à mars 2013
FLEXIBLES & UMBILICAL DESIGN: PROJECT: MOHO NORD - CLIENT: TOTAL (3 billion US$) * Design and analysis of Subsea Flexible Risers, Umbilicals and Transfer lines * Preliminary and Detailed Design of Subsea Flexible Riser Architecture * Strength and Clearance Analysis of Umbilicals and ...
Lire la suite
 

Riser Engineer - Installation

Chez BPP

De août 2011 à novembre 2012
Umbilical installation (Shakhalin Project): review and analysis of installation procedures for main and in-line umbilicals, expert reporting and risk advisor to insurance company. Flexible riser installation: review and analysis of installation procedures and dynamic simulation of pull-in operations ...
Lire la suite
 

PROJECT ENGINEER

Chez BPP-TECH

De 2011 à novembre 2012
FLEXIBLES, UMBILICAL & CABLES ANALYSIS on DIFFERENT PROJECTS * Umbilical installation (Shakhalin Project): review and analysis of installation procedures for main and in-line umbilicals in ORCAFLEX * Flexible riser installation: review and analysis of installation procedures and ...
Lire la suite
 

Cranfield University, Bedford

Master of Science , MSc in Advanced Mechanical Engineering

De août 2010 à août 2011
 

Naval Architect

Chez Mariotti Shipyard

De octobre 2009 à juillet 2010
Preliminary design of steel mega-yacht and cruising ship: structural design ship stability calculation in intact and damage condition (SOLAS); shipyard visits and works execution surveys for structures and machineries; inclining tests for stability: preliminary calculations, test planning and ...
Lire la suite
 

NAVAL ARCHITECT

Chez Mariotti Shipyard

De 2009 à 2010
* Design and fabrication of steel mega-yachts ; * Inclining tests for stability: preliminary calculations, test planning and execution in planned time. LANGUAGES: English: Fluent / Proficient French: Fluent / Proficien Italian: Mother-language
 

Dipartimento Di Ingegneria Navale, Genoa

Masters Degree, Dipartimento di Ingegneria Navale

De 2002 à 2009
Master Degree (5 years) Naval Architecture and Marine Engineering at Dipartimento di Ingegneria Navale (DINAV), University of Genoa, Italy. Final Score: 107 / 110
 

Research engineer

Chez Floating Wind Atlantic Forum

De mars 2008 à juillet 2008
CPD: Floating Wind Atlantic Forum, Brest 2016

Compétences

 
  • acceleration analysis
  • analysis of installation procedures and simulation
  • Autocad
  • Cost estimation
  • Design
  • EU Project management
  • experimental testing
  • Flexible Risers
  • Voir toutes les compétences (24)

Langues parlées

 
  • italien
  • français
  • anglais