Maxime Devilder

Maxime Devilder

Manager, Aquadev Thermique

A l'écoute d'opportunités
 

En poste chez Aquadev Thermique

Précédents : Total, TOTAL

 

Précédents : Lycées Professionnel De L'Habitat, IFP School / ENSPM, ICAM, Lycée Sainte Marie

 

    En résumé

    - Design well architectures, edit technical drilling programs, select equipments - Bring technical support during operations - Produce technical and operational synthesis - Ensure cost follow-up - Conduct studies to improve performance - Prepare and conduct call for tender to renew service providers and equipment contracts - Optimize activities of service providers and assess their performance - Ensure the respect of safety rules and frames of reference

Parcours

Manager

Chez Aquadev Thermique

De septembre 2013 à aujourd'hui
Creation of Aquadev Thermique plumbing company and website design. Plumbing - Heat - Renewable Energy- Ventilation - Water treatment Site internet: http://www.aquadev-thermique.fr/
 

Lycées Professionnel De L'Habitat, Gelos

CAP Installateur Thermique, Plomberie - Chauffage

De septembre 2012 à septembre 2013
Plumbing - Heat - Renewable Energy- Ventilation - Water treatment
 

Senior Drilling Engineer - Total France

Chez Total

De septembre 2011 à septembre 2012
Senior Drilling Engineer - Wells Architectures & Equipments Department • Assist pre-project, support affiliates for complex studies (HPHT casing design study in Brunei and Shallow ERD wells for Uganda) • Main contact with Directional Drilling providers, KPI Directional Drilling compilation • ...
Lire la suite
 

Drilling & Completion Engineer - Total E&P Indonesia

Chez Total

De août 2008 à août 2011
Drilling & Completion Engineer – Swamp barge - Development wells Operational support to a drilling swamp barge • Actively develop company’s HSE culture on site • Design well architectures, edit technical drilling programs, select equipments • Bring technical support during operations • Analyze ...
Lire la suite
 

Night Drilling Supervisor - Total E&P Yemen

Chez Total

De janvier 2007 à juillet 2008
Night Drilling Supervisor - Land Rig (HTC4 & ZPEB) - Development wells Under Balanced Drilling (UBD) in fractured basement formation • Guarantee staff health, safety and security, minimize environmental impact of operations and ensure equipments protection • Take operational responsibility on ...
Lire la suite
 

IFP School / ENSPM, Rueil Malmaison

Master, Drilling

De septembre 2006 à décembre 2006
- Well architecture, Drilling fluids, Drilling BHA, Cementation, Drilling equipments, Directional drilling, Mud logging, Work over, Drilling projects - Geology, Eruptive well equipment, Reservoirs treatment, Activation techniques
 

Rig Engineer - Total E&P UK

Chez Total

De janvier 2006 à août 2006
Rig Engineer - Dunbar platform Drilling ERD well and a multilateral well. • Tracking operations,Compile technical reports and studies on specific issues (e.g. Friction/Hydraulic Studies). • Torque & drag analysis and follow up, drill string design • Hole cleaning analysis and optimisation • ...
Lire la suite
 

VIE Forage - Total E&P Congo

Chez TOTAL

De septembre 2004 à décembre 2005
• Logistic project to improve tug boat rotation efficiency • Cost control for PDC06 • Supply procedure for drilling department • Provide KPI for well performance department
 

ICAM, Lille

Ingénieur, ingénieur généraliste

De septembre 1999 à juillet 2004
 

Compétences

 
  • Adaptabilité
  • Autonomie
  • Forage
  • Travail en équipe

Langues parlées

 

Centres d'intérêt

 
  • Foot
  • Kite surf
  • Planche à voile
  • Surf
  • Voile
  • motocross