2012# BONGA North West Project (1140m water depth Subsea Project) - Client: SHELL NIGERIA (SNEPCO)
- Flowline Termination Assembly (FTA) Design (SACS)
- Detailed Design of the Mudmat Locking System (new concept)
- Qualification Tests Specifications
- Follow-up of Testing Phases
- Missions in Nigeria
# SAIPEM SA - KIZOMBA SATELLITES (1340m water depth Subsea Project) - Client: Exxon Mobil
- Flowline Forged Pieces Design
- Single Hybrid Riser (SHR) Stand-by-Clamp design
- Top Assembly Hang-Off System Design
- FLET/PLET Hub connectors supports
- Pipeline Integrity check while being held in HOC and Safety Clamp
Software: SACS, ABAQUS
Standard: API, DNV, ISO
Subsea7
- Subsea Structural Ingénieur
SURESNES2012 - maintenant
ATKINS (UK)
- Structural Engineer
2008 - 2009Design and Analyses of Offshore Structures (Jackets, Topsides and Details)
THANET PROJECT (BP):
- Full Jacket Design including In-service, Load-out, On-bottom Stability, Pushover and Ship Impact analyses.
- Detailed design of pile sleeves.