Vinci Construction Grands Projets
- Ingenieur travaux
Rueil-Malmaison Cedex2013 - maintenantMetro de Doha Ligne rouge - QATAR
Ingenieur travaux
(depuis decembre 2014)
- Preparation et demarrage des travaux de construction des passages pietons souterrains realises avec faible couverture sous voies de circulation (methode dite "pipe roofing").
- Gestion et suivi de sous traitants (locaux et etrangers) specialises en forage horizontal, deviation/suspension de reseaux, travaux de demolition, excavations.
Ingenieur methodes
(precedemment)
- Responsables des methodes d'execution de trois stations de metro et leurs passage pietons souterrains associes, gestion d'une equipe multiculturelle de projeteurs.
Vinci Construction Grands Projets
- Methods engineer
Rueil-Malmaison Cedex2011 - 2013Worked on the SEA project. Its purpose is the construction of 279km of a high speed railway line running between Tours and Bordeaux.
Achieved the methods of construction of the seven main viaducts of this project, with special emphasis on:
- Construction and erection of the deck pre-cast elements;
- Temporary stays and prestressing;
- Special heavy-duty equipments.
Vinci Construction Grands Projets
- Methods engineer
Rueil-Malmaison Cedex2010 - 2011Construction of 30 km of a new motorway, at the location of the existing national road and without traffic interruption.
- Defined the methods and stages of construction of the underpasses and culverts on the entire section.
- Broken down the global construction stages and specified the appropriate traffic management.
- Looked for improvements of the design (road design, retaining structures, hydraulic, infrastructures).
- Integrated and synthesized design improvements.
Demathieu & bard
- Assistant site engineer
Montigny-lès-Metz2009 - 2009February - June 2009
Pre-graduate internship as an assistant site engineer, Nîmes, France.
Construction of a concrete frame bridge and a 100 meters long three spans steel-concrete composite bridge, for a total cost of 5,8 M euros.
- Project analysis and preparation: Achieved planning ; redacted quality, safety, and environmental contractual documents; Led negotiations with suppliers and subcontractors.
- Carried-out execution procedures, created a technical notice to set up the suspended formwork and shoring of the concrete cover slab of the composite bridge.
- Managed a team of six workers and a foreman, monitored sub-contractors activities, controlled excavation and foundations work.
2008 - 2008July - August 2008
BEFS (construction design office), internship as an assistant structural engineer, Toulouse.
- Carried-out rehabilitation studies of a 3 story reinforced concrete building of the University of Toulouse. Made diagnosis and designed the best structural systems to reinforce the structure.
- Designed reinforced concrete structures of various residential buildings with help of computer softwares like Arche or Effel. Produced blueprints using AutoCad.
CEBTP (groupe GINGER)
- Technician
2007 - 2007Summer internship, CEBTP (Ginger group: engineering company specializing in geotechnics and diagnostics of structures), Toulouse, France.
- Performed in situ tests (SPT, CPT tests).
- Completed laboratory analysis of soil samples, interpreted data and prepared reports.
- Investigated old buildings, gathered data, and developed structural models on computer softwares. Computed deflections and bearing capacity, established diagnostics and wrote reports.
Formations