Euro engineering
- MAP pylon
Puteaux
2015 - maintenant
-
Akka Technologies
- Business Manager
Paris
2015 - 2015
-
AKKA Group North America Inc.
- Business Manager
2014 - 2015
* Find new customer to deal with ;
* Management of collaborators (Recruitment, salary negotiation, ...)
* New contract negotiation (business case raising, rate negotiation)
* Project Estimation, resources organization. ;
* Support for Bombardier account with interaction with different Akka Agencies.
Achievements:
* Re-opening of MDA Account
* Obtain design project of several people.
* Maintain of specific and difficult accounts.
-
AKKA Group North America Inc.
- Tooling designer
2013 - 2014
Project name: Satellite testing and shipping tooling
* Create tooling set composed of: Shipping tooling, test plates, shipping plates, manutention tooling, etc. ;
* Create technical solutions.
* Validation of technical solutions ;
* Design and check of 3D models (NX 7.5)
* Design and check of drawings.
* Studies were done with the software NX7.5.
Achievements:
* All tooling accessories were delivered in time.
-
AKKA North America Inc.
- Design Lead
2012 - 2013
Project name: Avionic Capsule, Global 7000/8000
* Manage team of 7 People
* Improve technical solutions.
* Monitoring technical progress ;
* Validation of technical solutions ;
* Design and check of 3D models (Catia V5)
* Design and check of drawings and MDB.
* Implementation of follow-up documents
Achievements:
* Complete delivery of Hydraulic Bay package. ;
* The technical field is under control and all documents have been sent to Manufacturing.
Technical environment:
* The aim of this project was to modernize global 5000/6000 V4 Avionic Capsule.
* This Structural project goes from pressure bulkhead to radome bulkhead and contains all structure and system brackets.
* Design lead of Hydraulic Bay Package. ;
* Inputs are made up of V4 3D models, Global 5000/6000 drawing set and Bombardier ICDs and skeletons.Studies were done with the software Catia V5, I was leading a customer team.
Project name: FTB Pylon, A320 NEO for Pratt & Withney
* Improve technical solutions.
* Monitoring technical progress ;
* Validation of technical solutions ;
* Design of 3D models (Catia V5)
* Design of drawings ;
* Implementation of follow-up documents
* Studies were done with the software Catia V5.
Achievements:
* Pylon was delivered with success, within a shortened schedule.
Technical environment:
* The aim of this project was to design FTB Pylon for P&W to test and certify the new A320 Neo Engine. ;
* L3 was responsible of structure and systems design. ;
* Inputs are made up of 3D models and PWC Requirements. ;
* Involved in sheet metal, composite panels and machined structural parts design.
-
Akka Technologies
- Aerospace design specialist
Paris
2011 - 2012
Project name: Flight Test Installation, A320 Sharklet family
* Follow-up of design studies ;
* Monitoring technical progress
* Checker of outputs ;
* Validation of technical solutions ;
* Design of 3D models (Catia V5)
* Design of drawings ;
* Implementation of follow-up documents ;
* Improvement of process, check lists, manual ;
* Studies were done with the software Catia V5 but all environments were recovered with Cadds 5, Dvise and Gilda.
Achievements:
* All drawing set for 6 A320 are released ;
* The technical field is entirely under control and the customer gives us a total liberty on this project.
Technical environment:
* The aim of this project is the installation of measurements with associated acquisitions on the A320 sharklet family (A318, A319, A320 and A321) for flight test.
* This installation is mainly located in the nose area, landing gear box, pylons and cabin.
* It is made up of electrical racks, sensors, engineer station, electrical plate, camera...
* Responsible for design of the mechanical installations as well as of the electrical routings.
* Outputs is made up of 3D models, drawing set, electrical Graph 2D, schedule, breakdown structure...
Project name: Flight Test Installation, A400M
* Checker of outputs ;
* Design of 3D models (Catia V5)
* Design of drawings ;
* Implementation of follow-up documents ;
* Improvement of process, check lists, manual ;
* Studies were done with the software Catia V5, Primes and Primes System View.
Achievements:
* The 4 aircrafts are currently flying with our installations.
Technical environment:
* The aim of this project is the installation of measurements with associated acquisitions on the A400M aircraft.
* This installation is mainly located in the nose area, landing gear box and cargo.
* It is made up of electrical racks, temperature and pressure sensors, engineer station, electrical plate, camera...
* Responsible for design of the mechanical installations as well as of the electrical routings.
* Outputs is made up of 3D models and drawing set.
-
CT Ingenieros
- Aerospace designer
Getafe
2008 - 2011
Customer: Airbus
Project name: MAP Flight Test, A400M (Toulouse, France)
* New parts design, existing solutions modifications and repairs for structural or mechanical damages. ;
* New installation definition for flight test materials. ;
* Modifications in order to remove existing flight limitations on aircraft.
Achievements:
* Correct advancement of certification flights
Technical environment:
* Work in various domains (Structural, Mechanical and Electrical Installations)
* Work under pressure as sometimes, the solution need to be design and validated in less than 3 hours.
Project name: MAP Flight Test (MRB), A400M (Sévilla, Spain)
Nose fuselage mechanical system installation and ATA 21 Focal-Point for Airbus Germany:
* New parts design, existing solutions modifications and new definition or solution proposals for integration by Design Office.
* Technical solutions and answer for Q-meldungs, HNC, DQN and Concessions.
* Link between various design offices and production.
All fuselage, Electrical systems installation:
* Existing routings analysis, updates and solutions proposals. ;
* Management and answers to HNC, DQN and Concession ;
* Search of problem reasons through drawing, 3D model and real component.
Achievements:
* Correct advancement of Aircraft production ;
* Respect of Quality Chart, Correct flight with our installations
* Respect of answering delays, complying with aircraft production needs
-
Composite Industrie
- Composite designer
BONDOUFLE
2008 - 2008
Project name: A380 (ATA 21) :
* Drawings on CADDS 5
* Bill of materials management in Gilda ;
* Design of Air conditioning composite ducts on Catia V5 and CADDS 5