Entreprises

  • INPEX TOTAL Leam Chabang Thailand - HSE Lead

    2013 - 2016
  • Project EGINA TOTAL E&P Lagos NIGERIA - HSSE Senior Construction Engineer

    2010 - 2013 EGINA is deep offshore development with 1550m depth, Production 200kBPD of oil and 4.6 Mm3/d of gas export.
    Main activities are the basic engineering studies and the preparation of the main contracts.
    Contribute to the implementation of an effective HSE policy within the EGINA Project Team and all project contractors. FPSO (Floating Production Storage Offloading) Project.
    Advise EGINA HSSE manager on introduction of crisis management systems; ensure systems, operation, distribution and the preparedness of the relevant personnel.
    Involved in Call for tender clarifications on HSSE matter, Acting of HSSE audit team during pre-selection phase of EPC contractors Writing HSSE procedures due to new project (recording perimeter, training, ect…)
    Coaches HSE Nigerian supervisors at EGINA offices and provide them recommendations suggestions and tools.
    Review of HSE documents construction and operating procedures.
    Review design and detail design concerning safety matters in FPSO packages.
    Be part of evaluation of contractors and service providers. Establish a monthly reporting system on incidents, accidents and anomalies………..
  • YemenLNG (TOTAL SA) - HSE Construction Superintendent

    2006 - 2010 2006 – 2010 YemenLNG –Bal-Haf – YEMEN (TOTAL SA)

    HSE Construction Superintendent
    I start the project at the beginning. The main Contractor is YEMGAS
    The priority was to start going basis HSE rules as Safety induction, PPE , Road Traffic, Blasting, Tool Box Talk, Reporting, Hygiene Food….
    In charge of 10 safety officers, divided in 4 work areas, advising and monitoring Main contractor (YEMGAS) HSE team.

    HSE Process Superintendent
    Site activities :In charge of Process area (Train 1 and Train 2) regarding all safety aspects, particularly Work permit system ,Heavy lifting, confined space, work at height (scaffolding + grating installation), Post Welding Treatment, Radiography, Hydro test, air flashing, air blowing…
    End of construction, RFSU (ready for start up) ,working in commissioning areas.
    In charge of 3 safety sup and 5 safety officers, including 1 safety officer for nigh shift.
    I am involved also regarding the implementation of Methods statement and risk assessment and incident investigation did by the main contractor.
    .Reporting activities: On weekly basis , I ‘m doing HSE reports like :HSE Weekly Statistics , HSE Weekly Reports concerning site activities, HSE sub-contractor personal on site , IFU ( incident Follow up ) , SIN (summary incident Notification with Event Report after incident, Anomalies Database updating and Statistics , Key Performance indicator , Master file following audits done on site .

    HSE Superintendent SIMOPS phase
    In charge of Ready for start up and Gas in in Train 1.Opening Work Permit in Battery Limit Area, gaz check, Evacuation drill and mustering….
    In charge of last part of Construction Area (Train2) : Controlling construction operations included Radio activity ,controlling interface gas in under work permit. Controlling emergency devices needs to activate in case of gas leak coming from gas in area. Controlling access trough checkpoint. One of my safety officers is on night shift duty to cover all areas even gaz area.
    Reporting activities as previous one regarding Statistic. Daily and weekly reports
    Demobilization of all Camps, workshops, batching plant…..regarding safety matter and environment aspect.
  • TOTAL SOUTH PARS IRAN - HSE Construction and Production Superintendent

    2000 - 2005 2000 - 2006 TOTAL SOUTH PARS – Assalueyh - IRAN
    I was involved in several HSE positions during the gas development project (up to 12000 workers / 75 million man-hours / daily production 2.106 standard cubic feet) of Phases 2&3 for Total as well as for SPGC (delegated operator for NIOC (National Iranian Oil Company) since June 2004; this period includes Construction / Commissioning / Start-up / Production.

    Operational Safety Leader and Simops Leader
    In charge with all operations involving onshore and offshore activities, dealing with permit to work co-ordination. Preparation of hand-Over for the client, Advising Iranians to take over Management. Preparations of several shutdowns, Assisting Iranians to organize prepare and anticipate shutdown operations.

    Safety Area Authority.
    Management of a team of Iranian safety officers (including on-job-training), I had to control the site interfaces coordination during commissioning/ start-up/ production activities.
    Permit to work implementation.

    Head of HSE Department
    Including working on engineering, civil works, implementation of the Site HSE Management System.
    Assist main Contractor: HYUNDAI, to develop their HSE Management system according to the contract.
    Gas Treatment Plant Construction, pre-commissioning activiSafety Auditing / Prevention Plan / HSE Manual / Safety Induction / Permit To Work System / Emergency & Rescue Teams / Emergency Plan.
    Incidents & Accidents Reporting and Analysis System / Training.
    Environmental Management Systems / Area Safety Authority.
  • SCHLUMBERGER Sedco Forex - HSE Manager

    1991 - 1999 1991 – 1999 SCHLUMBERGER Drilling Company (Sedco Forex)

    (Onshore and Offshore drilling) Client: ELF, MOBIL
    HSE Manager in Congo and Angola
    Set up, monitoring and management of 11 drilling platforms and 7 logistics bases corresponding to 2500 people.
    Training performed on defensive driving and implementation of a specific road safety action plan. Regarding Security matters and as Congo was on civil war, writing of the Evacuation Plan for Schlumberger families. Close contacts with the French.
    Consulate for evacuation drills. Real air evacuation performed 28/02/99.

    Client SHELL, ELF, CHAUVCO, PERENCO, MOBIL
    HSE Manager in Gabon and Equatorial Guinea
    6 platforms and 2 camps harbouring to 1000 People Civil work for roads and heliport in jungle prior to drilling operations.

    Client SHELL, ELF
    HSE Engineer in Gabon
    Update 3 rigs from WRC under SCHLUMBERGER regulations.
    Training of the platform staff.
    Writing of working and platform moving procedures. Quality Audit of personnel and Equipment.

    Client ELF, ESSO, ANDRA (drilling for radioactive waste)
    Safety and Training Coordinator.
    Responsible for the training of people working on platforms in France.
    Procedure writing regarding the moving of drilling equipment further to national Authorities inspection.
    Permit to work co-ordination. LACQ refinery France
  • Ministere de L'Agriculture - Food hygiene Inspector

    Paris 1983 - 1991 1983 – 1991 VETERINARY SERVICES
    At first, acting as a trainee and locum inspector and then further to national test
    I passed & went 27 out of 600, and graduation in 1987 acting as a Food Hygiene
    and Animal Health Inspector in various locations: Bordeaux, Lyon, Paris.
    This qualification gives me all aspects regarding restaurant implementation “one way system” and secures my colleagues health against “Food poisoning”

Formations