Menu

Remi MOLINENGO

PARIS

En résumé

I am a Project, Installation & Operation Engineer specialised within Marine Energy Projects (Oil & Gas and Renewable).

My previous experience in well established installation Contractors (Acergy, Subsea 7 and Saipem) gave me the opportunity to be involved in large complex Offshore Tenders and Projects.
In addition, my involvement in innovative start-up (Ceona) and in business creation (Offshore Construction Associates France) made me develop a business oriented vision, a multidisciplinary spirit and an ability to think out of the box.
Finally, thanks to various expatriations (UK, Nigeria), I am enthusiastic in working in fast moving international environment.

I am now looking for opportunities in a human size company, who intends to have a strong impact on the development of Marine Renewable Energy projects.

Main Market Experience:
• Marine Renewable Energy
• Offshore Oil & Gas

Areas of Expertise:
• Engineering: Design, Installation Analyses, Installation Procedures
• Project Engineering
• Package Management
• Project Management
• Yard & Offshore Operations
• Entrepreneurship & Start-Up Creation
• Organizational Management

Key Words:
• Offshore Wind (Fixed & Floating)
• Tidal Energy
• Rigid Pipe (S-Lay, J-Lay, Reeling)
• Flexible & Umbilical
• Cable, Downline & Coil Tubing
• Electrical & Hydraulic Flying Leads
• Mooring System
• Structures Installation: Spools, Jumpers, Manifolds
• Wet Buckle Management

Mes compétences :
Ingénierie de Projet
Procédures d'Intallation
Structures
Design
ORCAFLEX
Calculs d'Installation
Ombilicaux
Flexible
Energies Hydroliennes
Energies marines
Cable
Energie éolienne
Pipeline
Offshore
Energies renouvelables
Pétrole
Entreprenariat
Business development
Management

Entreprises

  • Offshore Construction Associates - Engineering & Business Development Manager

    2017 - 2018 Engineering Manager, responsible for the development of a newly created start-up:

    • Business Development & Operational Management:
    - Development of Company Brand & Marketing strategy in the Marine Renewable Energy Market
    - Support for Corporate, Business & Operating Company strategy
    - Business Opportunities & Partnership identification
    - Company representative during Forums & special Events
    - Preparation of Companies procedures, standards, templates, organization etc.

    • Tendering Activities:
    - Full tendering process, bid review, technical & commercial proposals preparation
    - Team identification, manhours & associated costs definition
    - Commercial & technical interfaces with Clients & 3rd Parties
    - Clarifications & Qualifications management

    • Technical Consulting - Les Eoliennes en Mer Services (Ile d'Yeu / Noirmoutier & Dieppe / Le Tréport):
    - Technical support to Marine Construction Management package
    - Preparation of technical documentations (construction strategy reports, various Scope of Works etc.)
    - Documentation review for various packages (inter-array, foundation, wind turbine installation etc.)
  • Saipem (Paris) - Lead Installation Engineer (Contracted to)

    2015 - 2017 Lead Installation engineer, involved on Project and R&D:

    • Normand Maximus R&D: Rigid Pipe Reeling - Lead Installation Engineer:
    - Coordination of the Installation Procedures & Analyses package
    - Technical Support for Market Analyses
    - Technical Support for Tendering Activities
    - Development of Tools, Procedures & Methodology related to Reeling Activities

    • Liwan Project (China): Senior Installation & Operation Engineer:
    - Coil Tubing & Downline Installation Package
    - Jumpers & Spools Installation Package
    - Installation Analyses coordination
    - Interface with other Department & local Chinese Team for procurement, vessel modifications & equipment fabrication (VLS Tower)
    - Onshore Mobilization (Jutal Yard, China) for Jumpers & Spools operations
    - Offshore Operations (China Sea) for Jumpers & Spools operations
    - Offshore Operations (China Sea) for Pipe Emergency Works (diamond wire cutting, pipe recovery tool, pipe & PLET recovery, pipe reinstallation operations)
  • Ceona (London) - Senior Project Engineer

    2013 - 2015 Project Engineer responsible for various Design and Installation packages, in a small size Company:

    • Package Management - Anchors & Mooring (AJE Project - Nigeria):
    - Anchor Handling Tug Subcontract Management
    - Installation Procedures
    - Equipment Definition & Procurement
    - Installation Analyses Subcontractor Management
    - Technical Support to Commercial & Contractual Team
    - Client & Subcontractors Interface

    • Package Management - Flexible & Umbilical (ABO Phase 1 & 2 Projects - Nigeria):
    - Installation Procedures & Lifting Analyses
    - Offshore Representative for the full Offshore Campaign (flexible, umbilical, structures, flying leads & repairs)
    - Equipment Definition & Procurement
    - Installation Analyses Subcontractor Management (flexible, umbilical, riser laydown & pull-in, structure & suction pile)
    - Technical Support to Commercial & Contractual Team
    - Client & Subcontractors Interface
    - Assistant Project Manager to close remaining invoices

    • Technology Development:
    - Design & Installation to develop a Stinger on CEONA Amazon vessel
    - Tension Leg Platforms (tendons only) installation methodogy on CEONA Amazon vessel
    - Interface with Subcontractors (Huisman, 2H, Red Marine etc.) for concept development
  • Subsea 7 (Acergy Legacy) (Paris) - Senior Pipeline Engineer

    SURESNES 2011 - 2013 Senior Pipeline Engineer, responsible for Design, Installation Analyses & Installation Procedures on Project (OSO RE) and Tenders.

    • Design & Installation Analyses:
    - Wall Thickness, Cathodic Protection, Buckle Arrestors etc.
    - Material Take-Off etc.
    - Installation Analyses for shallow to ultra deep water (S-Lay, J-Lay, Above Water Tie-In, Shore Approach etc.)
    - Accidental Analyses
    - Steep S (normal lay & ILT installation) R&D Studies

    • Installation Procedures:
    - Method Statements
    - Equipment Material Take-Off & Equipment List Datasheet
    - Support for Offshore schedule

    • Onshore & Offshore Operations (OSO RE Project):
    - Cargo Barge Mobilisation (Gabon, Tchenge Yard)
    - S-Lay Operations in shallow water (Niger Delta, Nigeria)

    • Tender Support:
    - Clarifications & Qualifications
    - Cost Time & Resources Definitions
    - Time Estimates
    - Support to Commercial Team (planning & procurement)
    - Interface with other technical Departments
  • Subsea 7 (Acergy Legacy) (Nigeria) - Pipeline Team Leader

    SURESNES 2009 - 2011 Pipeline Team Leader, responsible for the day to day management & development of Acergy local content office (rigid pipeline department - 13 engineers) in Lagos, Nigeria

    • Operational Management:
    - Technical Authority for local pipeline department
    - Day-to-Day Management (planning, resources etc.)
    - Interface with International Partners, Clients & 3rd Parties
    - Recruitment & Training
    - Support for ISO 9001 Certification
    - Standard Procedures Implementation

    • Deputy Lead Installation Analyses - OSO RE Project:
    - Coordination of the local Nigerian team
    - Technical support for installation analyses (hold back cable initiation, normal lay, A&R & stacking height)
  • Acergy (Paris) - Rigid Pipeline Engineer

    2007 - 2009 Rigid Pipeline engineer, specialised in design & installation analyses on both Tenders, Projects and R&D studies:

    • Installation Analyses (Orcaflex & Offpipe):
    - Laying Operation: S and J-Lay (initiation, normal lay, lay-down)
    - Lifting Operation: Above Water Tie In, Riser Lifting and Lowering
    - Shore Approach: Shore-Pull, Towing

    • Asset Development:
    - Conceptual Studies for new vessels development & for existing vessels upgrade
    - Company Fleet capability screening & competitor market analyses

    • Design Analyses:
    - Wall Thickness Design
    - Buckle Arrestor Design
    - On-Bottom Stability
    - Cathodic Protection Definition

    • Tendering:
    - Material Take Off (MTO)
    - Qualifications & Clarifications Process
    - Support to Installation Team & Procurement Team
  • SLP Energy - Intern

    2007 - 2007 MSc Thesis:

    • Fatigue generated by wave environment on an offshore wind turbine

Formations

  • Cranfield University - Cranfield Campus (Cranfield)

    Cranfield 2006 - 2007 Offshore & Ocean Technology: Renewable Energy

    MSc Offshore & Ocean Technology - Renewable Energy

    * Renewable Energy: Technology,
    * Renewable Energy: Management,
    * Subsea,
    * Pipeline Design,
    * Offshore Inspection,
    * Corrosion,
    * Material in Offshore Environment,
    * Project Management.
  • Institut Des Sciences De L'Ingénieur De Toulon Et Du Var

    Toulon 2004 - 2007 Engineering Diploma - Physical Oceanography

    * Hydrodynamics,
    * Coastal Engineering,
    * Mechanical,
    * Management & Communication

Réseau

Annuaire des membres :