GB Groupement Berkine
- Shutdown Principal Planning Engineer
2017 - maintenant
EL-MERK CPF
Shutdown Principal Planning Engineer
- To develop the planning of the turnaround. ;
- Provides the planning and field resources to execute the plan. Develop the various plans
(Inspection, MOC's (engineering), Tie-ins and Maintenance)
- Preparing the initial plan (Level 0). ;
- To participate at different coordination meetings for integrated planning.
- Developing final plan including the General consolidated plan and initial planning.
- Developing and updating individual discipline plans on daily basis.
- Tracking plans and daily update of global plan. ;
- Reported progress to Management (% of realized and planned tasks).
- Working with the exploitation team to define the equipment affected by the shutdown.
-Working with the shutdown team for the preparation of the work packs and the shutdown Material
tracking
- Preparing the analysis report of the maintenance Support contract Status, expiry dates, on-going &
future contracts, reporting any possible contracts risks (expiry, increasing Value )
Page 1 of 4
-
JVGAS (BP/STATOIL/SONATRACH)
- TAR Planner
2015 - 2017
JVGAS (BP/STATOIL/SONATRACH)-
INAMINAS CPF TIGUENTOURINE
TAR Planner
- To develop the planning of the turnaround. ;
- Provides the planning and field resources to execute the plan. Develop the various plans
(Inspection, MOC's (engineering), Tie-ins and Maintenance)
- Preparing the initial plan (Level 0). ;
- To participate at different coordination meetings for integrated planning.
- Developing final plan including the General consolidated plan and initial planning.
- Developing and updating individual discipline plans on daily basis.
- Tracking plans and daily update of global plan. ;
- Reported progress to Management (% of realized and planned tasks).
-
ETTERKIB
- Project Control Manager
MEAUX
2014 - 2015
-
ETTERKIB SPA Company
- Project Control Manger
2014 - 2015
To prepare baseline schedule.
- To prepare master, Level 3 & level 4th schedule. ;
- To prepare resource histogram of project staff, manpower and plant & equipment.
- To Prepare latest forecast plan as per latest forecast quantity.
- To update schedule ;
- To prepare Weekly and monthly report ;
- To check the monitoring for updating schedule ;
- To generate the three weeks look ahead, One month, three month, six month look ahead with
manpower for each.
- To control the progress (Planned vs. Achieved: Period, Project to date)
- To prepare analysis reports. ;
- All works related to planning and control project.
-Attend meetings with clients and subcontractors
-
Orascom Construction Industries
- Planning Engineer
Le Caire
2013 - 2014
Key performance analysis using KPI.
-Update PMS (Project Measurement System).
-To prepare baseline schedule.
- To prepare master, Level 3 & level 4th schedule. ;
- To prepare resource histogram of project staff, manpower and plant & equipment.
- To Prepare latest forecast plan as per latest forecast quantity.
- To update schedule ;
- To prepare Weekly and monthly report ;
- To check the monitoring for updating schedule ;
- To generate the three weeks look ahead, One month, three month, six month look ahead with
manpower for each.
- To control the progress (Planned vs. Achieved : Period, Project todate)
- To prepare analysis reports. ;
- All works related to planning and control project.
-Attend meetings with clients and subcontractors
-
ORASCOM CONSTRUCTION INDUSTRIAL ALGERIA OCIA
- Planning engineer
2013 - 2014
-
Orascom Construction Industries
- Planning Engineer
Le Caire
2011 - 2013
Orascom Construction Industries sub-contractors with Petrofac
PROJECT:Central Processing Facilities (Oil & Gas Project) - El Merk - Algeria.
Position: Planning Engineer
-Key performance analysis using KPI.
-Update PMS (Project Measurement System).
-To prepare baseline schedule.
- To prepare master, Level 3 & level 4th schedule. ;
- To prepare resource histogram of project staff, manpower and plant & equipment.
- To Prepare latest forecast plan as per latest forecast quantity.
- To update schedule ;
- To prepare Weekly and monthly report ;
- To check the monitoring for updating schedule ;
- To generate the three weeks look ahead, One month, three month, six month look ahead with
manpower for each.
- To control the progress (Planned vs. Achieved: Period, Project to date)
- To prepare analysis reports. ;
- All works related to planning and control project.
-Attend meetings with clients and subcontractors
-
RED SEA
- Logestic engineer
2011 - 2011
with RED SEA company sub contractor within SAMSUNG Engineering.
- Follow-up of the P.O
- Delivery status day per day. ;
- Purchasing the necessary equipment & material for the project work. .
-
Orascom Construction Industrial Algeria OCIA
- Planning engineer
2011 - 2013
-
Samsung Engineering
- Ingénieur loquéstique
Séoul
2011 - 2011
- Logestic engineer with RED SEA company sub contractor within SAMSUNG Engineering.
1-Follow-up of the P.O
2-Delivery status day per day.
3-Purchasing the necessary equipment & material for the project work. .
-
SOMIK -SPA
- Planning engineer
2010 - 2011
- Planning engineer with SOMIK Spa sub contractors with SAMSUNG Engineering.
Using MSproject and PRIMAVERA PROJECT PLANNER” P3”
1-Follow-up of the progress and the scheduling of the project.
2-. Monitoring and recording progress day by day and ensure that the data entered into the master schedule is correct.
-
SOMIK Spa
- Planning engineer
2010 - 2011
SOMIK Spa sub contractors with SAMSUNG Engineering
Planning engineer
Using MSproject and PRIMAVERA PROJECT PLANNER'' P3''
-To Follow-up of the progress and the scheduling of the project.
-. To Monitoring and recording progress day by day and ensure that the data entered into the master
schedule is correct.
-
COJAAL
- Ingénieur maintenance
2009 - 2010
Plant Engineer in maintenance within Japanese company COJAAL
Japanese consortium for the Highway Algeria.
1 - Associated machine shop chief
2 - Follow-up the maintenance of the machines, the vehicles and the generators.
3 - Followed the base life of Indonesian man.
4 -Follow-up of the mechanic stock management of the workshop.
-
COJAAL
- Plant Engineer
2009 - 2010
Associated machine shop chief
- To Follow-up the maintenance of the machines, the vehicles and the generators. ;
- To followed the base life of Indonesian man. ;
- To Follow-up of the mechanic stock management of the workshop.