Menu

Vincent GRAS

GAP

En résumé

Mes compétences :
Supply Chain
Mechanical Engineering
Project Coordination
Workshop
Continuous improvement
Planning
Organisation
Stock management
Mechanical
Design
Logistic
Engineer

Entreprises

  • Serimax Malaysia - Vallourec Group - Procurement Manager

    2013 - maintenant •Responsible of overall Asia Pacific Stock and Inventory
    •Responsible of overall Asia Pacific Procurement
    •Definition of global department strategies and objectives
    •Development and integration to Vallourec group of procurement sourcing strategy
    •Development with sourcing director Vallourec group of General Purchasing
    conditions and supplier contracts
    •Development of supplier selection and performance monitoring strategies
    •Definition of stock inventory management models and Integration in the ERP with
    Serimax group inventory Manager of automatic stock level management.
    •Development of Key Performance Indicators for full monitoring and control from
    demand to supplier payment
    •Development of ERP network and Automatic reporting for the overall Supply Chain
  • Serimax Malaysia - Vallourec Group - Project supply coordinator

    2010 - 2013 Project supply department coordination:
    •Management of a team of 8 engineers (master degree)
    •Preparation of projects* equipments/parts/consumables
    (26 projects onshore/offshore/prefabrication/sales mobilized in 2012)
    •Assets ressources: 2,500 Equipments allocation and rental cost control for Asia
    Pacific region
    •Operation planning management for all Asia Pacific Region
    •Stock Inventory management in Asia Pacific Region: €6M
    *Example of projects : PNG LNG EPC5 (PNG/SPIECAPAG/Exxon Mobile) ;
    GORGON HDD&LANDLINE (AUS/AJ-LUCAS+KT/Chevron) ;
    GUMUSUT KAKAP S-LAY & J-LAY (MY/Sapura-Acergy/Shell) ;...

    Automatic welding offshore/onshore projects preparation:
    •Projects Technical focal point
    •Technical studies for equipments
    • Definition of spare parts and consumables to be supplied for the projects
    • Coordination of supply chain departments (workshop, assets, store, inventory, procurement and logistic) for project preparation
    • Project production follow-up and demobilization
    • Consumptions analyses, feedback for improvement

    Stock inventory supervision:
    • Material requirements planning (MRP)
    • Analyse of consumption and forecast
    • Definition of stock inventory parameters

    ERP implementation:
    •Implementation of new ERP (IFS) in Asia Pacific
    • ERP representative in Asia Pacific (troubleshoot and improvements focal point)

    Site investments management for 2012/2013:
    •Identification of weakness and strenght of operations on site
    •Proposal for site main investments to Vallourec group
    •Suppliers follow-up, commissioning on site
  • Serimax - Project supply engineer

    Villepinte 2009 - 2010 Project supply coordination for onshore/offshore projects in Asia Pacific Region :
    - Definition of the settings for the equipments
    - Definition of the needs in term of mobilisation, consumables and spare parts
    - Supervision of store supply
    - Supervision of maintenance activities
    - Supervision of Logistic activities

    Management of Logistic activities for the Asia Pacific Region :
    - Globalisation of the needs
    - Definition of transportation method
    - Planification of shipments
    - Follow-up

    Continuous improvement for project coordination with supply chain team :
    - Improvement of maintenance activities methodology
    - Improvement of coordination for parts supplying
    - Improvement of stock management in cooperation with asset managers
    - Improvement of workshop parts supplying
  • Hutchinson Palamos S.A - Process engineer

    2008 - 2009 Turning machines workshop organisation :
    - Improvement of working methodologies
    - Implantation of a part management system
    - Improvement of the communication inside/outside the workshop
    - Improvement of the flows for the production
    - Diminution of scrapping parts
    - Improvement of process
  • ETS Montreal - Vibrating mechanic laboratory - Mechanical Technician

    2006 - 2007 Conception of a testing machine for vibrating systems :
    - Physical Tests
    - Simulation of different systems under Matlab and Ansys
    - Design under Pro Engineer
    - Fabrication of the parts

Formations

Réseau

Annuaire des membres :