- Offshore operation supervision and coordination,
- Rigid pipeline and riser, flexible and umbilical installation operations,
- Load-out, transport, lifting and installation of subsea structures,
- Design and engineering of subsea pipeline and equipments,
- Drafting expertise,
- Equipment procurement and fabrication follow-up.


Mes compétences :
Construction
Offshore
Drawing
Supervision
Oil and Gas
Operation
Subsea

Entreprises

  • Xela Solution (www.xelasolution.com) - Independent Contractor

    2015 - maintenant Expert drafting and Support services for Oil and Gas companies,
     2D / 3D sketches,
     Installation / Standard Operation procedures story boards,
     Lift / Deck plans,
     Rigging arrangement and Fit up checks.
  • Technip - Offshore Construction Supervisor

    Paris 2010 - maintenant - Supervision for safe and effective execution of the project workscope in accordance with approved operating procedures, including mobilisation, deck and subsea activities,
     On pipelay vessel Deep Blue during Rigid Reel-lay, Flex-lay and Umbilical lay operations, Riser pull-in operations, Free Standing Hybrid Riser deployment, Piles and Structures installation,
     On 3rd Party vessel TideWater Enabler during subsea Umbilical commissioning and Flying Leads installation,
     On 3rd Party vessel Fugro Symphony during Field survey set up, pre and post lay activities, Flex-lay and Umbilical lay operations, Structures installation and Mattresses/Crossings deployment.
    - Define and Focus on critical path activities and awareness of parallel works,
    - Comply with Management of Change procedures,
    - Responsible person for Permit to Work system,
    - Maintain an accurate log of all activities conducted during the shift period through interfacing with all departments,
    - Conduct and participate in safety activities such as Tool Box Talks, Job Hazard Analysis, Management of Change, Risk Assessments,
    - Maintain a close operational communication with Offshore Construction Manager and all operational departments under their control,
    - Assist deck supervision where required with supervision of any on deck or quayside operations,
    - Lead day pre-shift briefings,
    - Give feedback to provide up to date information for procedure, task plans, project Inspection and Test Plan, Standard Operations Procedures and equipment lift plans,
    - Be familiar with any special procedures and limitations of equipment to be used for the work
    - Attend site to assist project team.
  • Technip - Operation Engineer

    Paris 2008 - 2010 - Barge engineer on pipelay vessel Deep Blue during Reel-lay, Flex-lay and Umbilical lay operations,
     Point of contact for vessel/Project interfaces,
     Preparation of operation engineer debriefing reports and lessons learnt,
     Pipelay equipment settings synthesis,
     Development of Standard Operations Procedures, vessel equipment lift plans and Risk Assessment,
     Review of Project procedures, operations task plans and pipelay installation analysis tables,
     Lead night pre-shift briefings.
    - Operational interfaces for Block 31 and Pazflor project,
    - Planning and operation review for tenders,
    - Mobilisation, operation and demobilisation support for pipelay vessel Deep Blue,
    - Development of standard J-lay equipment mobilisation procedure including planning, check lists, commissioning work, set up, and lift plans on pipelay vessel Deep Blue,
    - Operation feasibility study on deployment of riser at 3000m water depth.
  • Technip - Project Engineer

    Paris 2008 - 2008 - Installation procedure for 30" gas pipeline contingency repair work on Kvitebjørn project,
    - Riser study, configuration, quick disconnection hang off system and installation for arctic spar concept on Shtokman project.
  • Technip - Operation Engineer

    Paris 2006 - 2008 - Barge engineer on pipelay vessel Deep Blue during J-lay and Reel-lay operations,
    - Installation procedure for the deployment of 250Te buoyancy can part of Free Standing Hybrid Riser (FSHR) on PDET project,
    - Development of standard pipeline cold cutting system for Reel-lay vessel.\
  • Technip - Geotechnical Engineer

    Paris 2006 - 2006 - Analysis of stress in rigid pipeline during trenching operation and development of associated database,
    - Trenching risk analysis on Alvheim and Njord project,
    - Suction pile, riser hold back clump weight design depending of geotechnical conditions on Alvheim project,
    - Riser hold back clump weight design depending of geotechnical conditions on WaGE project.
  • ECAM Lyon - Engineer in partnership with ECAM

    2005 - 2006 - Vibratory study of an anti-rustles system for buses,
    - Analysis of the air flow disturbances due to the anti-rustles system.
  • Airbus - Engineer

    Blagnac 2004 - 2004 - Gathering information on the different wings de-icing systems,
    - Indexing the criteria of comparison,
    - Evaluating their potential for use on A30X and making recommendations for future study
  • Multi Transoports - Driver

    2003 - 2003 - Learning mechanic and electric knowledge regarding trucks.
  • SAGA - Driver

    POMPEY 2002 - 2003 - Filling and maintaining bottles of medical oxygen,
    - Testing the different bottles,
    - Delivering to the patient.
  • PSA Peugeot Citroën - Mechanic

    Rueil Malmaison 2002 - 2002 - Fixing cars in the mechanical and maitenance departments.
  • Multi Transports - Workforce

    1998 - 1998 - Discovering a company and discharging trucks.

Formations

  • ECAM Lyon

    Lyon 2001 - 2006 Ingénieur Généraliste

    Scientific and technical majors : Mechanical Engineering, Materials Science, Electrical and Electronic Engineering, Automation, Production and Management Engineering.
  • Lycée Fenelon BAC S

    Clermont Ferrand 1987 - 2001 BACCALAUREAT SCIENTIFIQUE

    Majoring in Mathematics, Physics and Biology.

Réseau

Annuaire des membres :