Menu

Franck CHABE

LA DÉFENSE - PARIS

En résumé

10 year experience in construction of major gas projects
Now deeply involved in the construction of the latest French nuclear power plant

Mes compétences :
Nucléaire

Entreprises

  • Freyssinet International - Project Manager

    2016 - maintenant
  • AREVA NP - Construction Manager

    Paris La Defense 2012 - 2016
  • SAIPEM SA - Lead construction - constructability engineer

    Montigny-le-Bretonneux 2010 - 2011
  • SAIPEM SA - Area Manager

    Montigny-le-Bretonneux 2006 - 2009 Leading the Engineering, Procurement and Construction activities related to building 3 x 160,000 m3 LNG storage tanks
    Based in Saint John, New Brunswick, CANADA
  • SAIPEM SA - Method engineer

    Montigny-le-Bretonneux 2004 - 2006 In charge of all the methods input for building the LNG storage tanks (piling works, jump form, welding of alloy steel) and the regaseification facilities (heavy lift studies, management of interfaces, plant construction philosophy, underground networks)
    Based in Guangdong province, People Republic of CHINA
  • SAIPEM SA - Onshore construction - methods engineer

    Montigny-le-Bretonneux 2002 - 2004 Technical input for bids for construction of LNG plants
    Studies for loadout of offshore structures (execution phase of project)

Formations

Réseau

Annuaire des membres :