Menu

Laurent LORCY

PARIS

En résumé

Mes compétences :
Retail design
Architecture
Management

Entreprises

  • Laurent Lorcy - Architecte

    2013
  • Christian Dior - Manager international retail roll out and quality control

    Paris 2011 - maintenant
  • COX architecture - Architecte

    2011 - 2011
  • Stuart Burgess Design - Architecte

    2011 - 2011
  • Eiffage - Architecte

    Vélizy-Villacoublay 2010 - 2010 Advanced Design phase and Development application submission
    • One of the lead architect in the layout and the design of the project.
    • Built CAD drawings.
    • Meetings with the clients, engenieers and the building surveyors on site.
    • Liaising with the landscape architect for security and global planning developement.
    • Liaising with the clients to learn his wishes about the program.
    • Produced D.A documentation with the accreditation of the project by the client.
    • Integration of the technical high security elements.
    • Elaborating the Fire safety and accessibility for handicapped persons notes.

    Achievement :
    • Member of a huge global project which cost a billion euros.
    • Project successfully launched on time.
    • Understand the importance of the existed walls in the cost of the final project.
    • Project management and timelines experiences.
  • Atelier d'architecture Philippe Challes - Architecte

    2009 - 2010 Restructuring of the Putanges secondary school, Putanges, France
    Public project High Environmental Quality Label


    The secondary school is composed by 4 distinct prefabricated concrete structure buildings from 1970.
    This project consists in the connection of the buildings to create a unified one. It had to respond to the evolution of the education program, but obviously to the handicapped and fire safety regulation. It also had to follow the objectives of the climatic plan that asks to regulate the heat loss with the implementation of a high performance exterior insulation.

    Advanced Design phase
    • Assisted lead architect in the layout and the design of the project.
    • Built CAD drawings and 3D models.
    • Meetings with the clients, engenieers and the building surveyors.
    • Liaising with the clients to learn his wishes about the program.
    Development application submission
    • Meetings with the clients, engenieers and the building surveyors.
    • Produced D.A documentation with the accreditation of the project by the client.
    • Elaborating the Fire safety and accessibility for handicapped persons notes.
    Professional phase (DCE in france : construction companies consulting)
    • Doubling the CAD drawings scales and integration of the technical elements.
    • Details drawings of the wood construction joining.
    • Layouts of the work schedules.

    Achievement :
    • Project successfully launched on time.
    • Construction details experiences.
    • Project management and timelines experiences.
  • Reichen & Robert et associes - Architecte

    2009 - 2009 The new airport of Nantes, France, Competition Public and private financing
    Architect / Draftperson - Design team of 5 persons.

    That project consists in a new organization of the air traffic in the west region of France. These organizations aims not just to create restructure the existing airport of Nantes but to create a new one in the north suburbs to globalize all the Bretagne region air traffic.
    So, this airport project is not just air terminals but a real city implant in the old French Boscages in a strategic site. It contains the air terminal and the runways but also hotels, car parks and all administrative air company buildings. In addition, it has to be well deserved by all the infrastructures. A high speed train station will take place under the terminal and the highway will be extended until the airport.

    • I was in charge of the air terminal and the boarding areas.
    • Description and integration of the functional programs.
    • Design and layout of the architectural proposal. Proposal of different frame structure.
    • 3D modeling of the whole project and his environment.
    • Built CAD drawings for the final competition.
    • Diagrammatic drawings of the development extensions areas.

    Achievement :
    • Project successfully launched on time.
    • Worked on a Public and Private financing project specifications.
    • Managed the competition team for the terminal areas.
    • Participated in the weekly meeting with the clients.
    • Great team experiences.
  • Archi5 - Architecte

    2008 - 2009 Restructuring of the Lamoriciere primary and secondary schools, Paris
    Architect and Project manager

    The restructuring Lamoriciere elementary school project is a High environmental quality project. This project had to respect the new climatic plan for Paris which ask to reduce the CO2 emission using best thermal insulation materials, creating our own energy...
    It's about the restructuration of a secondary school and the design of a new primary school.
    The all project is about 5000m2 with 2300m2 of a new wood construction in 3 floor added in the existing concrete building.
    The program also included 3 refectories for all the 300 students with a large school catering which may prepare 1100 meals per day for the schools around.
    In the existing building, our intervetion was to make the fire safety and the accessibility for handicapped persons up to date on the 4 floors of the building.

    Advanced Design phase
    • Supported and assisted lead architect in all phases of a major project.
    • Built CAD drawings based on information provided by customers and engineers.
    • Meetings with engenieers and the building surveyors.
    • Liaising with the clients, contractors and builders and ensuring the smooth running of every day operations.
    Development application submission
    • Liaising with the clients, contractors and builders and ensuring the smooth running of every day operations.
    • Produced D.A documentation with the accreditation of the project by the client.
    • Elaborating the Fire safety and accessibility for handicapped persons notes.
    Professional phase (DCE in france : construction companies consulting)
    • Details drawings of the wood construction joining.
    • Layouts of the work schedules.
    Achievement :

    • Worked alone as project leader in that project with lead architect subvision.
    • Wood construction details experiences.
    • High environmental quality project experiences in a public project.
    • Project management and timelines experiences.
  • Valode & Pistre Architectes - Architecte

    2008 - 2008 The great stadium of Lille – Lille, France
    Architect member of a design team of 8 persons.

    A 60 000 spectators athletic and soccer stadium with associated multi levels of parking (3500 places). The whole projects also include a big commercial area, hotels and sports clinic.

    Development application submission

    • Built CAD drawings based on information provided by customers and engineers.
    • Produced D.A documentation.
    • Layout of the stadium square environment and his regulation with the frame of the stadium.
    • I had to manage the public access from the underground car park and from all the different way to access the stadium. I also had to manage the security access.
    • Design of the independent multi storey car park for Development Application submission taking care of his integration in the urban skyline.
    • Attended Client and design team strategy meetings.
    Achievement :

    • Worked on a great public equipment.
    • Great team experiences.
    • Project management and timelines experiences.
  • SCAU - Architecte

    2006 - 2006 The SCAU Firm is a french firm of architects and engineers. Consisting of about 40 architects based in Paris. The firm specializes in several areas including : mostly healthcare, culture, education, sport, housings, offices and retail.
    That was the architects who built the amazing France's Stadium.

    Member of a design team of 4 persons
    The competion for a new hospital in Manosque.
    Competition lost
    The competition for the restructuration a the hospital of Rouen.
    Building in construction.
    The competition for the Prisons models of Poitier, Le mans and Le Havre. Competition lost.

    • In all that projects i was a member of the design team as drafter. I was in charge of the modification of the CAD drawings.
    • 3D modeling

Formations

Réseau

Annuaire des membres :