Menu

Farid MANZEH

L HAY LES ROSES

En résumé

Restructuring : Site closing, green field, Automotive & Machinery industry, Lean, 5S, 6 Sigma
multi sites management (Spain, Germany, Hungry, UK, Morocco),
worldwide management of Supply Chain,Sourcing, Manufacturing, Quality.

Mes compétences :
Supply Chain
Lean Manufacturing
worldwide management
health and safety management
cash friendly inventory management
Visual Management
Six Sigma
Quality Control
Promote educational training
Mechanical Engineering
Management of raw materials and inventory
Maintenance
ISO 14001 Standard
Develop excellent working relationships
Continuous Improvement Skills
Setting up Quality & Environment system

Entreprises

  • Körber Group - Operations Directeur

    2013 - maintenant * Build "Operations department" which integrate Supply Chain, Purchasing, Production, Processing, Quality, ... ;
    * Re-shape the plant organization,
    * Visual Management "shop floor control" and 5S ;
    * Reorganize and reinforce technical teams and management,
    * Transfer the most popular product to our sister Company in Hungary,
    * reduce waste by reducing inventory by more than 50% (on one year) which allowed to cancel external warehouses (savings = 744T EUR /y) and deploy lean manufacturing,
    * NPS (Net Promoter Score) increased from 18% on 2013 to 63%on 2014,
  • Hauni - Körber Group - Directeur des Opérations

    2013 - maintenant Missions: Professionnaliser les équipes & bâtir le département "Opérations"
    * Construire le département "Operations" en intégrant les services Supply Chain, Achats, Production, Méthodes et Qualité, ...
    * Conduire les changements nécessaires,
    * Coordination des chantiers d'amélioration permettant la réduction des coûts,
    Résultats:
    * Réorganisation des services,
    * Transfert d'une partie de la production à la filiale hongroise,
    * Réduction des stocks de 50% en une année,
    * Fermeture du magasin externe (économie de 144k€/an) et du deuxième site de production (600k€/an),
    * NPS (Net Promoter Score / Qualité) est passé de 18% en 2013 à 63% en 2014,

  • SMR Motherson - Directeur Usine

    2010 - 2013 Missions: Mobiliser les équipes, structurer les process et redresser la situation financière de l'Entreprise
    * Insuffler une véritable culture du changement pour amener les équipes à l’excellence,
    * Définir et mettre en œuvre les plans de progrès selon les besoins et en accord avec les directives du Groupe.,
    * Animer les réunions CE, DP, CHSCT et apaiser le climat social,
    * Participer à la stratégie commerciale, développer le chiffres d'affaire, et établir le Budget
    Résultats :
    * Amélioration de la productivité de 89,6% à 97.4%, réduction du taux d'absentéisme de 13,4% à 6.9% en 2011, diminution des stocks de 3,2M€ à 2M€ en 18 mois à périmètre identique,
    * Obtention de la certification FORD "Q1", nomination pour développer et fabriquer les rétroviseurs Mondéo (CA de 13m€/an) et la plateforme 15-40 chez Renault & Nissan (CA de 11m€/an),
    * Obtention de la certification OHSAS 18 001 "Management de la Santé et la sécurité au Travail" en Octobre 2012.

  • SMR Motherson Automotive - Plant Manager

    2010 - 2013 * Responsible for establishing and reaching plant goals on a daily, weekly, monthly, and yearly basis.
    * Establish and maintain a positive community relationship.
    * Encourage a well-trained and motivated staff. ;
    * Conduct employee performance reviews. ;
    * Management of raw materials and inventory of the plant on an on-going basis.
    Main achievements:
    * Spectacular achievements were recorded on: Efficiency from 89.6% to 97.4%, Cash profit from (400T EUR ) to (100T EUR ),
    * Absenteeism reduction in manufacturing from 13,4% to 6,6%: established a multi-skilled work group to attack the issue.
  • Visiocorp - Directeur Etudes avancées / Support Directeur Opérations Europe

    2009 - 2010 Missions:
    * Développer de nouveaux concepts de solutions futuristes à intégrer dans nos rétroviseurs,
    * Piloter les programmes de réduction de coûts techniques,
    * Planifier l'affectation globale des ressources entre les sites européens,

    Résultats :
    * développement de 2 nouveaux concepts et déposition de brevet.
    * Amélioration des marges de 2 à 5% sur 14 produits.
    * Livraison dans les délais et conformément aux Budgets transferts des moyens de production entre les filiales,

  • Visiocorp - Innovation & Marketing Director

    2009 - 2010 * Achieved & obtained a patent for 2 new technologies. ;
    * Carried out on time 3 products transfers from our locations in Germany, Hungary and Spain.
    * Reduced Direct Material costs on several serial products "400T EUR savings / year"
  • Schenacker - Plant Manager

    2006 - 2008 Mission 2: Close the Plant
    * Restructuring plan had to be managed within 6 months without social conflict. Ensuring the smooth running of the plant regarding customers' expectations (low ppm level, rating delivery at 100%).
    * Negotiate with the Unions the economic and social conditions.
    Main achievements:
    * The keystone to our success was due to it being well prepared before the official announcement.
    * Plant performance in June & July were kept at a good level (EBITDA 100T EUR , Productivity =102,7%, ...).
    * Social agreement with the works committee was achieved after 28 days of intense negotiation.
    * Savings of 460T EUR about 13% of the Budget allowance up to the closing operation.

    Missions 1: Improve plant's performance
    * Manage factory and optimise the flow. ;
    * Establish production standards of efficiency, minimum waste and maximum utilization of resources (machines, raw materials and manpower).
    * Prepare budget and maintain/improve budget limitations to meet plant's annual objectives and standards according to sales projections.
    * Lead and stimulate middle management; clear and tangible objectives; coordinate training and succession plans.
    * Lead the works council and Health & Safety Committee to keep a fair working atmosphere.

    * Improved the profits by +6% ; EBITDA achieved for 2007 was 50% better than the Budget.
    * Set up and achieved 5 workshops of continuous improvement which allowed us to reduce manpower by 7.5%.
    * Signature of agreement "Convenio" with the Unions for the following 4 years.
  • Schefenacker - Directeur de site (Espagne)

    2006 - 2008 Missions2: Piloter la fermeture du site dans un contexte de baisse des ventes en 2008
    * Négocier avec les partenaires sociaux les conditions économiques et sociales de la fermeture.
    Résultats1 :
    * Préservation du bon fonctionnement du site après l’annonce de fermeture auprès des salariés et des partenaires sociaux,
    * Maintien des performances du site (EBITDA >100k€, Productivité =102,7%, …).
    * Accord conclu après 28 jours d’intenses négociations dans un climat de confiance et de respect mutuel,

    Missions1 : Améliorer et redynamiser les performances du Site.
    * Fédérer et dynamiser le middle management, organiser et planifier les défis de formation et plans de succession,
    * Animer les réunions CE et CHCST en veillant au maintien d’un climat social apaisé.

    Résultats2 :
    * Net amélioration de l’ensemble des indicateurs financiers et opérationnels (EBITDA +246% vs Budget, Cash Flow + 270%, part achats passe de 63% à 61,4% celle du taux main d’œuvre de 11,5 à 10,1%, ...),
    * Accomplissement de plusieurs chantiers d’amélioration continue / réduction des effectifs MOD de 5% par an .
    * Clarification des rôles par la redéfinition des missions des services et la mise en place du système back up.
    * Signature « Convenio : droits et devoirs des Salariés-Direction » avec les partenaires sociaux pour les 4 prochaines années.
  • Schefenacker - Responsable Production

    2002 - 2006 Missions :
    * Définir l'organisation de l’atelier Plasturgie permettant des gains de productivité
    * Gérer et animer une équipe de 120 personnes (Cadres, Ingénieurs, AM, Agents de production) et 35 presses à injecter,
    * Assurer le développement des compétences, des performances et de la motivation des équipes,
    * Optimiser les moyens de production et préparer l’entreprise à l’introduction de nouvelles technologies,
    Résultats:
    * Création du pôle Plasturgie : Production, Méthodes, Maintenance, Outillage, Essais et Qualité (usine dans l’usine),
    * Installation de 3 Silos de 83 m3 chacun (Octobre 2003) / réduction d'un tiers du nombre de manutentionnaires,
    * Achat de 14 presses sur 3 années et instauration des pools de 4 presses par opérateur à partir d'avril 2003 (gain/an ~140k€),
    * Promotion de la Formation, instauration du plan de succession et aboutissement de la démarche 5S,

  • Schefenacker - Production Manager

    2002 - 2006 * Define the organization of the Moulding Unit to obtain better productivity
    * Optimize the production average and preparation for the introduction of new technologies
    * Participate in the Group's « Best Practices » meetings
    * Setting up Plastic sector : Production, Methods, Maintenance, Tooling, Quality tests (installed inside the plant),
    * Setting up of the first and last 3 Silos; 83 m3 each. (
    * Acquisition of 14 moulding machines during these 3 years, as well as the set up of a new principle : 1 operator had to manage 4 moulding machines which allowed a yearly benefit of 140k EUR .
    * Promote educational training and succession plans.
  • Britax - Quality & Environmental Director

    Taunusstein 1999 - 2002 * Start up of the Spanish location and implementation of the Quality and Environmental systems.
    * First Quality certification obtained in January 2000, which was maintained over the following two years.
  • Britax - Directeur Qualité & Environnement (Espagne)

    Taunusstein 1999 - 2002 Missions
    * Assurer le démarrage du site Espagnol (Green Field) et mettre en place les systèmes Qualité & Environnement,
    * Former et préparer l’équipe espagnole à prendre le relais,
    Résultats:
    * Première certification QS9000 - ISO 9001 du site en janvier 2000 et son maintien au cours des années suivantes,
    * Obtention de la certification Q1 FORD en février 2001 et ISO 14001 en mars.
  • Britax - Quality Director Deputy & Suppliers Quality Manager

    Taunusstein 1995 - 1998 * Organization, planning and performance of the Quality audits in France and abroad.
    * Set up Quality tools (SPC, Design Plan, 8D Problem Solving, and FMEA…)
    * Certification EAQF for headquarter and the 13 facilities in French and abroad.
    * Unified the quality system (the 14 Plants in France and affiliates abroad used the same Quality Procedures).
  • Britax - Directeur Qualité

    Taunusstein 1995 - 1998 * Mettre en place le système qualité suivant les référentiels EAQF94/QS9000 et la démarche AQF
    * Obtenir la certification EAQF94 / ISO 9001 en juin 95, EAQF94 /QS9000/ISO9001 en juin 97,
  • Labinal / Valéo - Internal Quality Auditor

    1992 - 1995 * Organization, planning and performance of the Quality audits in France and abroad.
    * Set up Quality tools (SPC, Design Plan, 8D Problem Solving, and FMEA...)

    * Certification EAQF for headquarter and the 13 facilities in French and abroad.
    * Unified the quality system (the 14 Plants in France and affiliates abroad used the same Quality Procedures).
  • Manducher - Ingénieur Qualité

    1991 - 1992 * Mettre en place le SPC dans les ateliers d'injection et peinture.
    * Formation de l'ensemble des employés aux outils Qualité (SPC, AMDEC, 8D, Plan d’Expérience).

Formations

Réseau

Annuaire des membres :